jointless造句1. The technique of semi - integral abutment jointless bridge has a bright future.
2. Jointless turnout is a key technique in developing CWR track across section.
3. Super long jointless track on elastic monolithic track bed is a new type of track structure, and has been extensively used for long railway tunnels and urban light rails.
4. Jointless bridges consist of integral abutment. The beam, abutment and flexible pile serve as an interal system.
5. A lot of people to explore the jointless bridge, I tell you, truly seamless bridge is no bridge, when the card after, use of nail length card a stack of cards on top of it, and neat poker.
6. Jointless design method is used for an overlong transfer structure. The box section transfer beams are chosen, and the technique of prestressed concrete with bond is used.
7. This paper introduces application of jointless technology in U. S. and China and carries out basic discussion on key points of jointless bridge designing.
8. The jointless track on bridge is different from the jointless track laying on the traditional subgrade.
10. It was based on ZPW-2000A Jointless Track Circuit Frequency-shift Automatic Block System, which was widely used in our country's railway sections.
11. The results can be used to guide the design and the maintenance of jointless turnout on bridge.
12. Temperature span is one of the main factors to affect the jointless track on bridge.
13. We shall first fix the temperature filed and thermal stress field of jointless dam in construction period through simulation calculating.
14. Based on the general formula for the stability analysis of common jointless trac ks, the calculation method for the stability of switches of a jointless turnout is put forward.
15. A finite element model was established for lateral expansion and bending of jointless track, and corresponding formula was deduced and computation program was developed.
16. The company "KSP Steel" is the first manufacturer of steel jointless pipes in Kazakhstan. The total area occupied by production objects is about 133 hectares.
17. The paper suggests a good solution for solving the problem of wrong alarm by DX3 type crossing signal equipment on ZPW-2000A jointless track circuit.
18. Alternating reading and writing of the two SDRAM that generates the jointless transmission buffer is controlled by programmable logical device FPGA.
19. According to the different span of the bridge, they are classified as two types, i. e. the jointless track on the small span and middle span bridges and the jointless track on the long span bridge.
20. The paper introduces the methods and procedures for manufacturing and testing simulated circuit of UM71 jointless track circuit, and analyses the interlocking relationship and failure search.