control limit造句1 NCL: No control limit is allowed.
2 The supervisory and control limit of years shall be formulated separately by the Customs General Administration.
3 If the sample observation is beyond the control limit, it signals as the control chart with fixed sampling interval (FSI).
4 The launch of a software control limit function,[www.] for launch time is too long to avoid damage to machine.
5 The short-term goals and minimum / standards established for measures in Workplace 2000 will be treated much like control limits.
6 From the macroscopic Angle pursued after the comparative analysis, we can realize these problems, with built-in management level of enterprise risk control limit has a direct reason.
7 By investigating the microbial diminution and growth in meat-product processing, we determine the corresponding critical control points and control limit to extend its shelf life.
8 For critical applications an alarm can be set to activate should the oxygen level exceed a set control limit.
9 Under population follow normal distribution hypothesis, designing combine median-range adaptive control charts with variable sampling interval, variable sample size and variable control limit .
10 This paper points out that only when an economic control chart is designed can it be made use of economically, and the key problem is how to determine the economic control limit.
11 HACCP control tablet covered critical control points (CCP), evident hazard, critical control limit, monitoring measures, and error correction measures etc.
12 P75 of medical expense of each disease can be considered as upper control limit.
13 Based on the theory of the design of crack control and the crack control limit value, an equation to calculate concrete diaphragm wall"s bending moment is deduced."
14 An equation to calculate concrete diaphragm walls bending moment is deduced based on the crack control limit value.
15 Test result in many times indicated that the detection value was all in the control limit. The relative standard deviation was 0 . 7% with high accuracy .
16 This includes computing and interpreting capability indices estimating the % failures control limit calculations etc.