design change造句1, The basic design changed little from that patented by Edison more than 100 years ago.
2, Performance is the primary objective of design changes.
3, To compensate for the design change in the application, Implementor records and automatically updates each part of the application affected.
4, Members can point to, modify and discuss design changes on a multi-page document.
5, Six major points require fundamental design changes, perhaps costing as much as £60 million.
6, But design changes can be a key determinant of the experience curve for a generic group of products.
7, There are two main problems with fast-track projects: design changes and cost overruns.
8, Those recommendations follow those issued in December,[http:///design change.html] including design changes to insulate the tanks from heat sources.
9, For further information on the Design Change System, refer to Section 6 of this manual.
10, Publishes the design change written notice, Renewal blueprint.
11, Product design change review implement.
12, Design change procedures must be created and verified.
13, I love the simplicity of a small design change for a big impact.
14, Payment issue, import & export , CCC, quality, design change, wrong shipment etc.
15, Design change should try to advance, change occurs earlier, the smaller, and loss.
16, Design change and engineering alternation obviously affect the cost of project.
17, Raising injection pressures brings particulates down but puts NOx up; the same goes for many other design changes.
18, This chapter explores both the promise and the pitfalls of considering organization design changes.
19, To rectify a problem you should refer to Section 6 - Design Change System.
20, Usually an administrative service, e.g. notifying all interested parties that a Design Change is awaiting assessment.
21, We pay attention to the sports world change, renews the design change about each sport star player or the celebrity polo shirt for you.
22, Advanced techniques and methods are influencing and promoting the design change of underground engineering.
23, How do we decide if we need to implement a design change?
24, Prepare quality plan and inspection sheet for new project or design change.
25, The difference between the total manufacturing costs before and after a design change is evaluated.