bridge deck造句(1) The bridge deck carries both eastbound and westbound traffic.
(2) The cross section of a bridge deck may twist as a result of excessive life.
(3) As the most damageable component of bridge, concrete bridge deck is maintained more often than others.
(4) Marly crack and deterioration of many bridge deck overlays have been attributed to the traffic load, nature factor and high thermal or shrinkage stress development in the concrete.
(5) A simulated bridge deck is tested for durability and strength to determine its breaking point.
(6) Bridge deck corrosion has been a problem in the snow belt areas.
(7) The bridge deck will be partly constructed in antimagnetic material.
(8) Bridge deck overlay is a complex and comprehensive subject including bridge structure, overlay structure, overlay material and binding course material.
(9) A bridge deck must be a continuous structure to provide greater rigidity.
(10) The steel bridge deck is a set of pavement structure, pavement materials and integrated waterproof adhesive material issue.
(11) Large sections of bridge deck are pushed out over the piers on rollers or teflon bearings.
(12) Bridge deck pavement is a important pavement structure of bridge's appurtenant works, and the shorting using life is always a difficulty which puzzles bridge workers.
(13) Bridge deck, poop deck, main deck, forecastle deck shall have total 9 life buoys.
(14) First, I cut an access hole in the Bridge Deck and glued the Wheelhouse to it.
(15) The aluminum alloy bridge deck designed in chapter four was used for the footbridge, and the stiffness, natural frequency and stability factor is calculated also.
(16) Second, the three bridge deck is smudge of color is purple-red and red bridge and sisters.
(17) As the most damageable component of bridge, the concrete bridge deck is most required to maintain.
(18) They were placed by a derrick mounted on rails on the bridge deck.
(19) The modifying effects of polyacrylamide on road performance of cement concrete bridge deck overlay are studied.
(20) The mechanical and application condition of pavement on long span steel bridge deck is so hard that the paving material is of high requirement.
(21) No honeycombs, pitting surface and cracks may exist on the surface of the waterproofing concrete along the bridge deck pavement, there shall be no cracks at the construction joints.
(22) Epoxy Asphalt binder is an important part of Epoxy Asphalt pavement for steel bridge deck.
(23) Changes in strand tension can be easily determined if the bridge deck is resurfaced.
(24) In allusion to the special demands of steel bridge, this paper makes benefit study of the application of SMA in steam box beam bridge deck pavement with steam box beam.
(25) The gait-model bridge girder erection machine mainly applied to the erection of long-span, large-tonnage and double amplitude bridge deck concrete full-span box girders.