final inspection造句1, On completion of the building, they make a final inspection.
2, Jim Hopkins is responsible for the final inspection of all goods before they are placed in the warehouse.
3, Is there a final inspection process?
4, In process and final inspection for finished goods.
5, Implement process inspection, final inspection, outgoing inspection.
6, Only the cartons handled for Final Inspection need to be inspected.
7, Factory QC conducts final inspection per standard AQL or as per industry standards.
8, Do labeling and packing of finished products after final inspection.
9, Final Inspection is available in both 16 oz spray bottles and 1 gallon containers.
10, Perform incoming material inspection, on - line inspection, final inspection and production control in manufacturer's factory site.
11, Is a final inspection performed on the panels after cure to the requirements in the Spec?
12, Performing other duties as needed as finish product final inspection etc.
13, Make final inspection of components before delivery on supplier side.
14, The Degas Quality Inspector must document the Final Inspection on the Inspection Report Form.
15, Final inspection by almost all test points ,[http:///final inspection.html] 90 points for Benedictine College Shanghai Campus reference.
16, Final Inspection of Garments may begin when at 80 % of finished merchandise is packed in cartons.
17, A failure will not appear unit has passed final inspection.
18, As the train pulled in, Djuro made a final inspection of the by now spotless buffet car.
19, Today is of course a Saturday, but my father was at the Planetarium making a final inspection.
20, Visitors to Lyle on a factory tour stand on the final inspection platform.
21, Please review to Page 1 for shoe illustration and description, Page 2 for final inspection report, Page 3 for B/L copy.
22, Responsible for incoming inspection, in - process inspection and final inspection.
23, Examination of the process, in the middle of a prior inspection, testing and final inspection.
24, At unloading port, buyer will use CIQ OR SGS as final inspection authority.
25, Responsible for final quality inspection for finished parts, and writes final inspection report.
26, Make quality control methods for incoming goods, in process and final inspection.
27, Prepare daily, monthly quality reports for incoming, processing, and final inspection.