footbridge造句31. The path continues upstream. Cross the footbridge and follow the steep zig-zag path up to the wall and the ladder stile.
32. Public passageway to the footbridge connected to the lot.
33. The footbridge washed away during the floods.
34. The swollen river washed away the footbridge.
35. To connect to the footbridge from Central Market.
36. Please use the footbridge over there. It's safe.
37. Use a pedestrian crossing, a footbridge or a subway to cross the road.
38. The footbridge is designed to accommodate loads of public crowds, taken as full or partial loading in the most unfavourable conditions.
39. Go ahead and take the footbridge at the traffic lights.
40. A footbridge at 3 F connecting Tuen Mun Trend Plaza.
41. It provides connection to connect a footbridge across Shau Kei Wan Road.
42. The footbridge support and connection point receives the footbridge from Tsuen Wan Transport Complex.
43. The footbridge leads from the Pavilion of Broad View , visible at left, to South Lake Isle.
44. The Czechs are very proud of a new police station and footbridge they have constructed.
45. Twenty-seven people were injured yesterday when a footbridge collapsed near the Jawaharlal Nehru Stadium, home to the opening and closing ceremonies, television channel CNN-IBN reported.
46. They had to walk across an emergency footbridge, holding onto a rope that served as a rail.
47. Public right of way at Level 2 connecting the footbridge.
48. It connects with the development and the footbridge accessible from Tsuen Wan Station Multi - storey Carpark Building.
49. Provide footbridge, Multi - storey Carpark, Public Transport Interchange and Subway.
50. On all accounts, beams and arches bear loads together in papilionaceous partial tied arch footbridge which can realize the equilibrium of strength and beauty.
51. Saunders sat on a footbridge over a dried creek bed munching on a muffin.
52. Link to footbridge across Luen ChIt'street and is accessible from Wing Fok Centre.
53. The aluminum alloy bridge deck designed in chapter four was used for the footbridge, and the stiffness, natural frequency and stability factor is calculated also.
54. To a footbridge, which will be accessible from Sham Mong Road and Hing Wah Street West.
55. The footbridge is accessible from and the support and connection point receives a future footbridge.
56. A double - deck footbridge at Level 2 and Level 3 connecting the lot and Fortune Plaza.
57. A footbridge at level 2 connecting Plover Cove Garden and Tai Po Centre ( Phase 3 ).