bill of material造句1. Generate and maintain bill of material.
2. BOM ( Bill of Material ) is one of the research hotspot in ERP system.
3. Prepare the BOM ( Bill of Material ) according to the scheme provided by the Technical Department.
4. Develop circuit board designs using CAD tools to capture schematics and create bill of material documentation.
5. The easy to use software offers detailed views and a bill of material shopping cart.
6. To provide feedback on design, manufacturability and process consistency , Bill of Material improvements.