快好知 kuaihz


boiler造句
241. The design features for OTSC boiler start-up system of Mitsui Babcock and start-up system selected for Yangzhou Power Plant project OTSC boiler and its operating mode are introduced. 242. Exhaust boiler damper motor is rewound, installed and tested after changing brake coil. 243. The article analyzes the safety questions on the coal -fired boiler during it is renovated to oil-fired boiler and analyzes the solutions to the question. 244. Based on the situation of flue gas disposal system of boiler 5 in Tianjiaan Power Plant, encrustation reason, scaling principle and the system running parameters are explained individually. 245. Applications of high voltage inverter in the power plant boiler supply is explained. 246. The start-up and control system of the supercritical once-through boiler were described, which includes the start-up system classification, the features of system config. 247. Two different thickness calculation formulas of ellipse head presented in the"Application Manual of Calculation Standard of Boiler Strength"was analyzed, and a united formula was put forward. 248. The project consist in the installation of oil - heating boiler and chip drier both fueled with residues. 249. In this paper, the study of low cycle fatigue behavior of BHW-35 Steel material and weld bead using in fabrication of power plant boiler was introduced, a few of important conclusion was suggested. 250. The test shows that size distribution of feeding coal, volatile content and its release as well as the total air rate and primary air ratio will influence the post combustion in CFB boiler. 251. In order to reduce the erosion of water-wall, large furnace sectional area should be selected by boiler works, and the power plant should select the coal caloricity close to the designed for use. 252. Ear protection is required for entry into designated high noise areas that include Utility Building, ETP blower room and Boiler house (when one or two boiler run). 253. The main process can be divided into: Coal handling, Carbonisation, Coke handling, Byproducts separation, Gas purification, Auxiliary boiler plant, Biological effluent treatment. 254. The way to transform boiler into burning BF gas one is put forward in this paper, which solves how to keep the boilers in normal operation by supplying BF gas directly to boilers without gas holder. 255. Field mice flesh, will thin pork is cut piece, put into arenaceous boiler with sealwort , commensurate rice boils congee. 256. An oil-splattered BP engineer's boiler suit has become one of the most successful Halloweencostumes in the United States. 257. Heating surface distribution is sufficient and sensible, the boiler heating-up and pressure boost -up quickly, strong output, high thermal efficiency. 258. Pulverized coal fired boiler in the firebox usually must be equipped with wind flow meter. 259. Firstly, a fault detection algorithm of boiler water level sensor and feedwater pump is given based on the association rules and neural networks. 260. The boiler discharged steam. 261. By utilization of the existing boiler a horizontal combustion furnace and a burner that match have been designed for the recovery of the latent heat in the blow gas. 262. Caution: Always observe the Boiler Pressure Gauge when using this feature. 263. To develop large capacity CFB boiler, the prediction of the partial load performance of CFB is becoming more necessary. 264. It provides a useful method of noise elimination for an industrial boiler room. 265. To improve tracking and disturbance rejection properties, the input state and input output feedback linearization methods are used to design the control laws of a boiler turbine system. 266. The effective use of energy in an industrial plant heating system depends on the efficiency of boiler, heat consuming equipment as well as heat transmission in the system. 267. Steam-injection boiler is the key equipment of thermal drive, and it is also the equipment whose energy consumption is the largest in the thermal drive process.