快好知 kuaihz


substation造句
31. This paper introduces the application of The 'SP' synthesization foam spray fire extinguishing device for a main transformer in the substation. 32. An expert system based on frame theory for automatic generating operation sequences of substation is introduced in this paper. 33. The anti-taking degating device in substation is an important measure to prevent personal and serious facility accidents caused by incorrect operation in electric equipment running. 34. By means of two aspects mentioned above, the Electromagnetic Compatiblity of substation is improved and the safe and stable operation of substation is realized. 35. An assembly of metal - clad switchgear and a step - up outdoor substation are shown at the generating station. 36. By using distributed intelligence module, the power substation automation system based on fieldbus realizes the measurment and control of all the electric signals and protection signals. 37. Outdoor terminal box management is an important part of substation equipment management. 38. Power facilities have a 110 KV substation, 35 KV substation 6, a more adequate supply of electricity. 39. Based on the main wiring circuit analysis of a typical substation, component failure model is established for substation outage, repairing, and normal working by stratified state enumeration method. 40. This paper with 220/110/10 kV step-down transformer substation design as an example, elaborated the power system engineering of substation part electrical design (a part of the whole process of). 41. Computer network were built among dispatching center, immediate power station and substation. Oscillate data is translated to dispatching center through public telephone network or other channels. 42. The tests of the grounding apparatus mounted at the transformer bushing tap and oil-filled paper condenser type bushing of 220 kV transformers in Shahe substation is presented. 43. Gave the intelligence to monitor the transformer substation control system the hardware electric circuit, the software design procedure and the signal procedure design. 44. This paper mainly studies on the application of artificial intelligence technology on thermal fault monitoring of transformer substation. 45. This paper proposes an innovation graph method for the location and identification of the substation bus topology errors. 46. Delay uncertainty problem may happen in the transferring process of the distributed relay system which takes substation Ethernet to be communication networks. 47. We are the member of Transmission and Substation and High-voltage Switch Gear Association of China, Association of Equipment and Industry of Transmission Substation. 48. It is excessive to investigate, over valuation, and repeated assess may make public station substation lost the independence power and activity. 49. The substation equipped with a transformer of 500 KVA is at the south of the plant. 50. The numerical distributed bus protection had been testedwill be put into operation in a 220 kV substation. 51. The grounding equipment is very important aspect when discussing the problem of substation Electromagnetic Compatiblity. 52. Substation mechanism holds title of provincial and civilized unit 13 years continuously. 53. At the end, the example of Luodong Substation is listed to verify that current injection method is not applicable to substations under complex operation mode, then another solution is brought up. 54. There are sub-Sandy Ridge Zhangjiakou Power Plant, 110 KV Substation 2, 35 kV Substation 6, total capacity 157 million kwh. 55. Ethernet technology has already been applied to the substation layers widely, but it has seldom been ap- plied to distribution monitor terminal units. 56. The structure and construction method of one kind of distributed fault diagnosis system for box-type transformer substation based on multiple artificial neural networks are described. 57. In this paper, SSMES with fault current limiting function for substation applications is proposed. 58. According datum of forecast point of substation and power network is optimized by graph model. 59. With strong antidisturbance for fixed deviation design, it's suitable to be applied in power plant and Substation. 60. This paper designed a function code system of a management system of equipment for substation.