spillway造句1. If there is heavy rain, the spillways must be enlarged to allow the floodwater to escape before the dam bursts.
2. Dongfeng hydropower station is open ski spillway.
3. Stepped spillways is a type of new spillway structure.
4. The stepped spillway is interested by engineers due to its excellent function of energy dissipation and aerification .
5. The velocities over the spillway buckets of three roughness surfaces and two radius are measured by LDV in the National Key Laboratory of the Hydraulics for the High-velocity of CUST.
6. A certain reservoir dam spillway slope stability and affect the normal operation of the reservoir storage key projects.
7. The project comprises construction of a rockfill dam, spillway system, intake structure, headrace tunnel, surge shaft, Read More ?
8. The section size of the tunnel spillway of is 14.
9. The stepped spillway is interested by engineers due to its excellent function of energy dissipation aerification.
10. The concrete placement for spillway and overflow weir at Dongba Hydropower Station employs light type formwork.
11. Water hole, spillway sediment tunnel, put the diversion tunnel hole, mouth, etc.
12. The control section of spillway is the key section to curb the water flow.
13. The spillway is opened and the flood runs down rapidly.
14. The spillway was used only once before, in nineteen seventy-three.
15. The spillway cannot be blocked, otherwise it will cause a serious problem.
16. The Morganza Spillway is about seventy-five kilometers upriver from Baton Rouge, the state capital.
17. Subsequently, an apron was added and the spillway training walls were improved.
18. The characteristics of an ungated overflow spillway are investigated. Some important design aspect and hydraulic computation methods for the spillway entrance zone are discussed.
19. The Turtle rises so high behind Larimore Dam that it goes over a spillway and creates a spectacular waterfall 50 feet high.
20. The torrent picked up buildings, animals, and human beings and sent them crashing down the spillway.
21. The paper focuses on the key and difficult technical problem of crest overflow of concrete face rockfill dam, analyses and researches spillway on dynamical and static stability.
22. Based on the optimized discharge curve computed from the optimal dispatching of one flood, an energy loss function and a new method, the spillway dynamic tracking (SDT), are established.
23. In order to improve the deposition efficiency, the traditional sand basin has been improved by adding a spillway trough on spillway crest along the flow direction.
24. Also the stream function and flow velocity of the internal points, and the distribution of velocity and pressure on the spillway are got.
25. The energy dissipation rate is 40 to 70 % higher than that of the spillway.
26. Monitoring observation localization for Geheyan Project in 1998 flood season was the deep outlets, the surface spillway, the still basin and auxiliary energy dissipators.
27. The paper studies the united energy dissipator with the grid and stepped spillway face by means of the spillway of Liudingshan reservoir.
28. The outer bulging step energy dissipater is one type energy dissipater in chute spillway, and has been applied in water projects.
29. This technique is particularly effective where a riffle drops into a pool or at the dis-charge of a spillway or penstock.
30. This is the 'Glory Hole' at Monticello dam, and it's the largest in the world of this type of spillway, its size enabling it to consume 14, 400 cubic feet of water every second..