快好知 kuaihz


trestle造句
31. HeLong Trestle was constructed by steel tube pile bracket after comparing some schemes. 32. The plan selection and construction of construction trestle bridge and bored platform were introduced, and the construction methods of borehole and cofferdam were also presented. 33. Large-span arch truss steel bridge is a common superstructure of trestle bridge on open sea. 34. Wants to give me to relate asas possible , I the Shina District trestle! 35. A study was made on maximum gradient of ferry trestle bridge for Yanda Railway. The principle of max. gradient computation is described and the formula for computation of maximum gradient is derived. 36. For this, reasonable use existing way, build trestle, become the one big characteristic of annulus road. 37. A bracket on the mast of a ship to support the trestle trees. 38. The barrel (20) is supported on means such as a trestle (11) which has roller bearings (15) to facilitate free axial rotation of the barrel. 39. An analysis was made of current situation of study on railway ferry trestle bridge, technical characteristics and existing problems. 40. This trestle bridge is characterized by unit interchangeability and bay adjustability. The application in construction site has proved its good performance. 41. The next day, he set up the trestle table we had bought under a tree, and there he worked with his shirt off,[www.] and singing. 42. The paper states the design of the trestle protection of foundation pit of intercepting trunk in Longhugou regulation in Santou City. 43. This paper introduces how to dismantle yarding tractor loading board, install trestle pole and use tightwire and chain wheel to load and unload cargo. 44. The structure and function of the automatic loading measurement control system of train trestle bridge are introduced, and the testing method of measurement accuracy is put forward. 45. The first piece is about the tractive calculation on railway trestle. 46. Its upper end is hinge connected to a trestle on top of the tower head. 47. The pile foundation construction technique at dissolution lime- rock area for the trestle bridge of Huaqing Express Highway are introduced.