lead time造句1. There is a long lead time between order and delivery of the product.
2. The truss system requires a very long lead time.
3. Stage overlapping and communication patterns Development lead time is directly affected by the nature of engineering problem solving.
4. The lead time as shown is the time taken between the order being made and the delivery taking place.
5. This can shorten the lead time, but to be effective it must be accompanied by the correct information processing pattern.
6. Lengthy lead time on procuring PreciPitators and bag-houses may extend the time frame for completion of some conversions past one year.
7. Samples: Advise lead time as wellsampling charges if any.
8. Standard Lot Size and Lead time Lot Size.
9. Support reduced vehicle delivery lead time & manufacturing restrictions.
10. What is the lead time for production of skiwear?
11. To reduce the cost and lead time of developing a trimming die, a method to obtain the trimming line in flange process is proposed on the basis of blank grid deformation.
12. Reducing order lead time can be taken by reducing batch.
13. And the price of changes and the updated lead time should be negotiated by the both paries .
14. Enter the desired Variable Lead time and save the form.
15. Is additional lead time required after PPAP approval to meet the QTC?
16. Developing new components regarding Quality, Price and Lead time matters.
17. However, reducing lead time can lead to the change of ordering cost.
18. The international automobile industry is a typical case where shortening the product development lead time is recognized as a valuable competitive weapon.
19. The benefit of the first method is that it cuts total lead time while leaving each individual stage length unchanged.
20. One of the problems with magazine advertisements, however, is their relatively long lead time before an advertisement appears.
21. The objective is to simultaneously optimize the order quantity, reorder point, back-order discount and lead time.
22. The reorder point should cover the average material requirements expected during the replenishment lead time.
23. Flexibility Product volume changes, short set-up time, short delivery lead time, conflict resolution.
24. This dissertation studies the model and simulation of inventory control system when the factors as random demand and lead time are uncertain.
25. Supervise and update material unit price, supplier information and minimum stock, lead time of each model for PMC and other documents in purchasing department.
26. The optimization of material requirement planning of assembly manufacture under lead time uncertainty was studied.
27. The state-of-the-art facility provides a regional "order to deliver" platform and ensures that Allison delivers customized products with the shortest lead time.
28. Then a risk transfer algorithm is presented, as well as risk evaluating, bottleneck risk identifying, risk adjusting and optimizing is discussed by taking lead time risk as an example.
29. Within operations there exists a substantial portion of two key elements of successful business_profits through the control of costs, and cash flow through planning decisions and lead time control.
30. Following a review of the procedures, measures have been introduced to shorten the lead time from inception to commencement of construction of a capital works project.