快好知 kuaihz


dam造句
241. To the dam monitor mainly is to its deformation point displacement observation as well as the physical interpretation which distorts to the dam. 242. The calculation and analysis of the core type rockfill dam of Lubuge Hydropower Station are conducted by the programs of total stress method and effective stress method. 243. Through analysis of some result of reservoir dam defectiveness detecting, the feasibility and effectiveness of resistivity tomography method in reservoir dam defectiveness detecting are discussed. 244. The horizontal arch ring type and its shape optimization are the two important considerations in arch dam design. 245. Yushugou reservoir project is built in our country, it is the first overfall Concrete Face Rockfill Dam(CFRD) which has been carried out flood discharge. 246. Steep and antithetic platy structure of rock mass and geomorphology of the longitudinal valley in the dam site area cause wide-range toppling deformation on the cross-strait slope. 247. Risk assessment is the most cost - effective method in dam safety management. 248. When it comes to environmental change, the implementation of the Three Gorges dam and reservoir is the great granddaddy of all changes. 249. We shall first fix the temperature filed and thermal stress field of jointless dam in construction period through simulation calculating. 250. Locals run a little-known homestay — where you get to learn about Tai Dam culture and history and join in village life. 251. Boarded Se Hanta , Trinidad dam, boundless expanse of woodlands panoramic view. 252. On the stage, Mrs. Van Dam was making her cruel insinuation against Laura. 253. Plumb-line breaking accident of dam safety monitoring system of Feilaixia Hydro Project is analyzed in this paper. 254. The fault has been mainly in stick slip from Subei to Arkesai, and in creep slip from Bage Valley to Changma Dam since Holocene Epoch. 255. The paper analyzes the significance of unit control theory in warping dam construction and introduces applied cases. 256. anti-seismic analysis of concrete arch dam is significant content of arch dam's safety estimate. " 257. The main purposes of the second stage artificial cooling in concrete arch dam are to make transverse joint grouting possible, and decrease the dam's temperature stress. 258. It guaranteed the closure of the dam across the Yangtze River. 259. Since the dam was completed in 2006, the natural spring that once fed Pipola has dried up. 260. Shape of arch dam is very important to its safety, cost and construction. 261. We will help you install new and better equipment at the Tarbela Dam power station on the Indus River. 262. At last, using the chosen eigenvector and kernel function build dam deformation forecasting model. 263. Now, more and more scientists pay their attention to the effects of dam reservoirs on the biogeochemical cycle of riverine nutrients and succedent aquatic ecological problems. 264. To increase the shear strength on lift joints of the high roller compacted concrete dam(RCCD), a kind of construction method is brought forward. 265. The dam must be closed before the rainy season sets in, or all our labour will be lost. 266. The symmetrical ventilation at one end of vault in the main underground workshop of Xiluodu Power Dam was studied by the method of CFD. 267. So was John Foster Dulles, the American Secretary of State, when he flew to Egypt to conduct negotiations on the Aswan Dam. 268. Statistical model is one of the most widely used models in the dam security monitoring application. 269. The Olympic National Park then enveloped Glines Canyon Dam in 1938, even though it was illegal for dams to be located in national parks. 270. GPS, filling const ruction, quality control, integrated system, face rockfill dam.