购销合同英文
推荐度:
英文购销合同
推荐度:
英文劳务代理合同
推荐度:
相关推荐
英文合同范文集锦10篇
随着法治精神地不断发扬,人们愈发重视合同,关于合同的利益纠纷越来越多,签订合同也是非常有必要的行为。那么相关的合同到底怎么写呢?以下是小编为大家整理的英文合同10篇,仅供参考,欢迎大家阅读。
英文合同 篇1
ABC 服饰有限公司
ABC Garments & Accessories Co., Ltd
售货合约SALES CONTRACT
合同编号CONTRACT NO.ABC091102
日期DATE NOV. 02, 20xx
买方BUYER Arrabon Trading ,Unit 9, Central Office Park,
257 Jean Ave, Centurion
Tel: +357 27 664 0587 Fax: +357 27 664 0586
卖方SELLER ABC GARMENTS & ACCESSORIES CO., LTD
HONGXIN ROAD, HANGZHOU, ZHEJIANG,CHINATEL: FAX:
双方同意按下列条款由买方购进卖方售出下列商品:
The Buyers agree to buy and the Sellers agree to sell the following goods on terms and conditions as set forth below :
(1) 货物名称及规格,包装及装运墨头| (2) 数量 |(3) 单价| (4) 总价
Name of Commodity, Specifications, QuantityUnit Price Total Amount
boy’s denim long pant 1000PCSUSD9.50 USD9500.00 boy’s twill long pant1000PCS USD10.00 USD10000.00TOTAL: USD19500.00 SPECIFICATION AS BELOW:
Fabric: 100% cotton, 8 oz denim/40s40s 133/72 twill
Size: 9 – 36 month,Long pant with front mock(fake) fly,
waistband stud opening,back elastic with belt loops.
PACKING:
One polybag per pc, 10 pcs a carton-box, solid color/
per carton-box, 5 moisture-proofing agentper carton-box,
an inner-cover-cardboard per carton-box
MARK:
MAIN MARK :SIDE MARK:
ARRABONARRBON
DESRRIPTION:N.W.:
COLOR: G.W.:
QTTY :20xxPCSNO.: 1 TO UP/TOTAL CTN NOS.
(装运数量允许有5%的增减 Shipping QuantityFive Percent More or Less Allowed)
(5) 装运期限Time of Shipment50DAYS AFTER THE SELLER RECEIVE THE L/C.
(6) 装运口岸Port of loading SHANGHAI
(7) 目的口岸Port of Destination LIMASSOL, CYPRUS
(8) 保险投保InsuranceALL RISK AND WAR RISK COVERED BY BUYER
(9) 付款条件Terms of Payment IRREVOCABLE L/C AT SIGHT
该信用证必须在 45天 前开到卖方, 信用证的有效期应为装船期后15天, 在上述装运口岸到期,
否则卖方有权取消本售货合约并保留因此而发生的一切损失的索赔权 .
The covering Letter of Credit must reach the Sellers 45 Days Prior to the Shipment Date and is to
remain valid in above indicated Loading Ports 15 days after the date of shipment, failing which the Sellers reserve the right to cancel this Sales Contract and to claim from the Buyers compensation for losses resulting therefrom.
其他条 款 OTHER TERMS :
(1) 异议 : 品质异议须于货到目的口岸之日起30天内提出,数量异议须于货到目的口岸之日起15天内提出。 但均须提供经卖方同意的公证行的检验证明. 如责任属于卖方者卖方
于收到异议20天内答复买方并提出处理意见.
QUALITY/QUANTITY DISCREPANCY: In case of quality discrepancy, claim should be filed
by the Buyers within 30 days after the arrival of the goods at port of destination, while for quantity discrepancy claim should be filed by the Buyers within 15 days after the arrival of the goods at
port of destination. In all cases, claims must be accompanied by Survey Reports of Recognized
Public Surveyors agreed to by the Sellers. Should the responsibility of the subject under claim
be found to rest on part of the Sellers, the Sellers shall, within 20 days after receipt of the claim,
send his reply to the Buyers together with suggestion for settlement.
(2) 信用证内应明确规定卖方有权可多装或少装所注名的百分数,并按实际装运数量议付。 (信用证之金额应较本售货合约的金额增加相应的百分数)
The Sellers reserve the option of shipping the indicated percentage more or less than the quantity hereby contracted, and the covering Letter of Credit shall be negotiated for the amount coveringthe value of quantity actually shipped. (The Buyers are requested to establish the L/C in accordwith the indicated percentage over the total value of order as per this Sales Contract.)
(3) 信用证内容须严格符合本售货合约的规定,否则修改信用证的费用由买方负担,卖方亦 不负因修改信用证而延误装运的`责任。并保留因此而发生的一切损失的索赔权。
The contents of the covering Letter of Credit shall be in strict accordance with stipulations of the Sales Contract; in case of any variation thereof necessitating amendment of the L/C, the Buyersshall bear the expenses for effecting the amendment. The sellers shall not be held responsible for possible delay of shipment resulting from awaiting the amendment of the L/C, and reserve the right to claim from the Buyers compensation for the losses resulting therefrom.
(4) 除经约定保险归买方投保者外,由卖方向中国的保险公司投保。如买方须增加保险额或 须加保其他险,可于装船前提出,经买方同意后代为投保,其费用由买方负担。
Except in case where the insurance is covered by the Buyers as arranged, insurance is to becovered by the Sellers with a Chinese insurance company. If insurance for additional amountand/or for other insurance terms is required by the Buyers, prior notice to this effect mush reach the Sellers before shipment and is subject to the Sellers’ agreement, and the extra insurance premium shall be for the Buyers’ account.
(5) 买方须将申请许可证副本(经有关银行副署)寄给卖方俟许可证批出后再即用传真通知 卖方,假如许可证被驳退,买方须征得卖方的同意方可重行申请许可证。
The Buyers are requested to send to the Sellers authentic copy of the License-application
(endorsed by the relative bank) filed by the Buyers and to advise the Sellers by fax immediately
when the said License is obtained. Should the Buyers intend to file reapplication for License
in cases of rejection of the original application, the Buyers shall contact the Sellers and obtain the
latter’s consent before filing reapplication.
(6) 商品检验:产地证明书或中国有关机构所签发的品质数量/重量检验证,作为品质数量/ 重量的交货依据。
INSPECTION : The Certificate of Origin and/or the Inspection Certification of
Quality/Quantity/Weight issued by the relative institute shall be taken as the basis for the shipping Quality/Quantity/Weight
(7) 因人力不可抗拒事故,使卖方不能在本售货合约规定期限内交货或不能交货,卖方不负 责任,但是卖方必须立即以传真通知买方,如果买方提出要求,卖方应以挂号函向买方提供由中国国际贸易促进委员会或有关机构出具的证明,证明事故的存在。买方不能领
到进口证不能被认为系属人力不可抗拒范围。
The Sellers shall not be held responsible if they owing to Force Majeure cause or causes fail to
make delivery within the time stipulated in this Sales contract or cannot delivery the goods.
However the Sellers shall inform immediately the Buyers by fax. The Sellers shall delivery to
the Buyers by registered letter, if it is requested by the Buyers, a certificate issued by the China
council for the Promotion of International Trade or by any competent authority, certifying to the
existence of the said cause or causes. Buyers’ failure to obtain the relative Import license is notto be treated as Force Majeure.
(8) 仲裁 : 凡因执行本合约或有关本合约所发生的一切争执,双方应以友好方式协商解决,如果协商不能解决,应提交北京中国国际贸易促进委员会对外贸易仲裁委员会根据中国 国际贸易促进委员会对外贸易仲裁委员会的仲裁程序暂行规则进行仲裁,仲裁裁决是终 局的,对双方都有约束力。
ARBITRATION : All disputes arising in connection with the Sales Contract of the execution thereof shall be settled amicably by negotiation. In case no settlement can be reached, the case under dispute shall then be submitted for arbitration to the Foreign Trade Arbitration commission of the China Council for the Promotion of International Trade in accordance with the ProvisionalRules of Procedure of the Foreign Trade Arbitration commission of the China council for thePromotion of International Trade. The decision of the Commission shall be accepted as final andbinding upon both parties.
买 方卖方 THE BUYERSTHE SELLERS
.
英文合同 篇2
Contract for Equipment Sales and Technology Licensing
Contract No. ____________________
This Contract (hereinafter referred to as the “Contract”) is made and entered into as of ________ (the date of signature ) in ________ (the place of signature) through friendly negotiation by and between _____________, a company incorporated and existing under the laws of ____________ with its registered address at _________________________________, and with its principal place of business at _________________________________ (hereinafter referred to as the “Buyer”), and ____________________, a company incorporated and existing under the laws of the People’s Republic of China with its registered address at _________________________________, and with its principal place of business at _________________________________(hereinafter referred to as the “Seller”).
Whereas, the Buyer desires to engage the Seller to provide the Equipment, related design, Technical Documentation, Technical Service and Technical Training and to obtain from the Seller a license of Patent and/or Know-how in relation to the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products. Now it is hereby mutually agreed as follows:
Article 1 Definitions
1.1 “Acceptance ”means the Buyer accepted the Equipment in accordance with Article 11.5.
1.2 “Commissioning” means the operation of the Equipment in accordance with Article 11.4 for the purpose of carrying out Performance Test.
1.3 “Contract” means this Contract signed by and between the Buyer and the Seller, including Appendices attached which shall form an integral part of this Contract.
1.4 “Contract Products” refers to all types of the products manufactured with Patent and/or Know-how under the Contract, details of which are specified in Appendix 1.
1.5 “Destination Airport” refers to _____________Airport.
1.6 “Effective Date of the Contract” means the date when the Contract enters into force upon fulfillment of all the conditions stated in Article 18.1.
1.7 “Equipment” means the equipment, machinery, instruments, spare parts and materials supplied by the Seller as listed in Appendix 3.
1.8 “Erection” means placing the Equipment to the positions according to the design drawings, and connecting it with relevant equipment and utilities.
1.9 “Improvement” refers to new findings and/or modifications made in the validity period of the Contract by either party on Patent and/or Know-how in the form of new designs, formulas, recipes, ingredients, indices, parameters, calculations, or any other indicators.
1.10 “Job Site” means the site where the Equipment shall be located and/or erected, namely ____.
1.11 “Know-how” refers to any valuable technical knowledge, data, indices, drawings, designs and other technical information, concerning the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment as well as manufacture of the Contract Products, developed and owned or legally acquired and possessed by the Seller and disclosed to the Buyer by the Seller, which is unknown to either public or the Buyer before the Date of Effectiveness of this Contract, and for which appropriate protection measures have been taken by the Seller for keeping Know-how in secrecy. The specific description of Know-how is set forth in Appendix 3.
1.12 “Last Shipment” means the shipment with which the accumulated invoice value of shipped goods has reached ____ ( ) percent of the total Equipment price.
1.13 “Patent” refers to any and all of the effective patent rights possessed by the Seller and licensed to the Buyer under the Contract in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, the No. and list of which are set forth in Appendix 3.
1.14 “Performance Test” means the tests for examining whether the Equipment is able to meet guarantee figures specified in Appendix 1.
1.15 “Technical Documentation” means the technical indices and data, specifications, drawings, processes, technical and quality standards, and other documents carrying the descriptions and explanations of Patent, Know-how and other technical information, in connection with the Erection, Test Run, Commissioning, Performance Test,operation and maintenance for the Equipment, as well as manufacture of the Contract Products, to be provided by the Seller as listed in Appendix 4.
1.16 “Technical Service” means the technical instruction, assistance and guidance rendered by the Seller as per Appendix 6.
1.17 “Technical Training ” means the training rendered by the Seller as per Appendix 7.
1.18 “Test Run” means the initial run of a single machine or the whole system of the Equipment without materials.
1.19 “Warranty Period” means the period of the warranty given by the Seller as specified in Article 12.2, during which the Seller is responsible for the defects of the Equipment as per Article 12.
Article 2 Scope of the Contract
2.1 The Seller’s Obligation
2.1.1 The Seller shall supply the Equipment, provide the design, Technical Documentation, and conduct the Technical Service and Technical Training, and grant the Buyer a right to use the Patent and/or Know-how as set forth in the Contract.
2.1.2 The Seller shall supply the Equipment which is listed in Appendix 3, the specification is detailed in Appendix 1.
2.1.3 The Seller shall provide design in accordance with Appendix 5, and submit to the Buyer the Technical Documentation listed in Appendix 4.
2.1.4 The Seller shall conduct the Technical Services at the Job Site as per Appendix 6.
2.1.5 The Seller shall conduct the Technical Training as per Appendix 7.
2.2 The Buyer’s Obligation
2.2.1 The Buyer shall at his own costs and expenses, provide the Seller with all information and data concerning the design as per Appendix 2. The Buyer shall ensure the completeness, correctness and accuracy of all such information and data.
2.2.2 The Buyer shall at his own costs and expenses, obtain all necessary import permits, undertake customs clearance, take delivery of the Equipment to be supplied by the Seller and transport them to the Job Site in time.
2.2.3 The Buyer shall at his own costs and expenses, perform all the civil works, construction, Erection, Test Run, Commissioning and Performance Test in accordance with the Technical Documentation under the Technical Services rendered by the Seller as per Appendix 6.
2.2.4 The Buyer shall at his own costs and expenses, supply all the equipments, spare parts and facilities required, except for the Equipment supplied by the Seller as per Appendix 3.
2.2.5 The Buyer shall at his own costs and expenses, provide the qualified and appropriate technical personnel, labor, tools, utilities and the Job Site in time for Erection, Test Run, Commissioning, and Performance Test as specified in Appendix 2.
2.2.6 The Buyer shall at his own costs and expenses, perform necessary administration and security guard at the Job Site.
Article 3 Grant of License
3.1 The Seller agrees to grant to the Buyer and the Buyer agrees to obtain from the Seller a license to manufacture the Contract Products as well as to conduct Erection, Test Run, Commissioning, Performance Test, operation and maintenance for the Equipment with Patent and/or Know-how as well as to use and sell the Contract Products. The name, model, specification, and technical data of the Contract Products are detailed in Appendix 1. The Buyer shall not make use of Patent and/or Know-how for any purposes other than those stipulated in the Contract without prior written approval from the Seller. The annual output of the Contract Products manufactured by the Buyer shall in no case exceed _______________.
3.2 (Option 1) The license granted under the Contract shall be an exclusive license. The Seller shall not retain its right to grant the licenses to any third parties, or to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.
(Option 2) The license granted under the Contract shall be a non-exclusive license. The Seller shall retain its right to grant the licenses to any third parties, and to explore Patent and/or Know-how as well as to sell the Contract Products by itself within the territory specified in Article 3.4.
3.3 The license granted under the Contract shall be a non-transferable and non-sublicensing license, under which the Buyer shall neither be entitled to transfer nor grant sub-license to any third party without prior written approval from the Seller.
3.4 Territory
3.4.1 The Seller agrees to grant the license to the Buyer only within the territory of _________________ (country or region). The Buyer shall not explore Patent and/or Know-how in any place other than the Job Site without previous written consent of the Seller.
3.4.2 The Seller agrees to grant a license to the Buyer to use and sell the Contract Products only within the territory of ________________________ (Country or region). In case the Buyer fails to perform its obligations under this Clause, all the actual losses and damages thus incurred to the Seller shall be borne by the Buyer, and the Seller shall have the right to terminate the Contract without prejudice to any remedies specified in the Contract.
Article 4 Price
4.1 The Buyer agrees to pay the total Contract price, Technical Training and Technical Service fee to the Seller.
4.2 The total Contract price, including price of the Equipment, design, Technical Documentation and a license fee in a fixed amount, shall be __________(say _______________________ only).
The breakdown price is as follows:
The price for Equipment is __________(say _______________________ only).
Fee for design is __________(say _______________________ only).
Fee for Technical Documentations is __________(say _______________________ only).
License fee is __________________(Say: _________________ only)
4.2.1 The total Contract price for the Equipment is for delivery CIF_____ Port, and the Technical Documentations is for delivery CIP (by air) ______ Airport. CIF and CIP term shall be interpreted in accordance with INCOTERMS 20xx, issued by the INTERNATIONAL CHAMBER OF COMMERCE (ICC).
4.2.2 The total Contract price includes the price for spare parts listed in Appendix 3. However, the total Contract price does not cover the supply of any other spare parts. At the Buyer’s request, the Seller may provide with any other spare parts. A separate agreement shall be signed between the parties.
4.2.3 The above price is fixed and firm.
4.3 The total Contract price does not cover the Technical Service fee and Technical Training fee specified in Appendix 6,7.
4.4 The total Contract price as well as the Technical Training and Technical Service fee shall not be regarded or in any way be explained or interpreted as covering any of the custom duties, taxes, or charges, fees, and expenses unless expressly listed in the Contract.
Article 5 Payment
5.1 Down Payment
Within ____ ( ) days after signing the Contract, the Buyer shall pay ____ ( ) percent of the total Contract price amounting ____ by T/T to the Seller.
......................The Beginning of Option.......................
5.2 [Option One: Payment by Sight L/C]
The balance of the total Contract price amounting ___ ( says ___ only ) shall be paid by an irrevocable Letter of Credit at sight, issued within ___ ( ) days after signing the Contract by a reputable bank in ___ acceptable to the Seller in favor of the Seller. The Letter of Credit shall be available upon the presentation of the following documents till ______(specific expiration date or a specific circumstance for the expiration of the Letter of Credit).
5.2.1 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:
(a) Bill of Lading in one (1) original and ___ ( ) copies;
(b) Commercial Invoice in one (1) original and ___ ( ) copies;
(c) Packing list in one (1) original and ___ ( ) copies;
(d) Certificate of Origin in one (1) original and ___ ( ) copies;
(e) Insurance Policy in one (1) original and ___ ( ) copies;
5.2.2 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:
(a) One (1) copy of the Acceptance Certificate signed by the Buyer as per Article 11.5, or the Seller’s written statement specifying the lapse of more than seven (7) days after the Seller’s notice requesting the Buyer to issue the Acceptance Certificate in accordance with Article 11.5;
(b)One ( 1 ) copy of commercial invoice.
5.2.3 ____ ( ) percent of the total Contract price amounting ____ (say ___ only) shall be paid by the Buyer to the Seller within _______ days after the following documents have been submitted by the Seller:
a) One (1) original Letter of Retention Guarantee in the form of Appendix 10;
b) One (1) copy of Commercial Invoice.
5.2 [Option Two: Payment under a L/G]
The balance of the total Contract price amounting ___ (say ___ only ), plus interest for deferred payment in the amount of ___ (say ___ only ), totaling ___ (say ___ only ) as detailed in Appendix 12 shall be paid by the Buyer by installments as specified in Appendix 12 and backed by an irrevocable Letter of Guarantee in favor of the Seller as per the Appendix 11, issued within ___ ( ) days after signing the Contract by the reputable bank in ____ acceptable to the Seller.
......................The End of Option.......................
5.3 All the banking charges incurred in the Seller’s bank shall be borne by the Seller while those incurred outside the Seller’s bank shall be borne by the Buyer.
Article 6 Delivery of Equipment and Technical Documentation
6.1 The Delivery of the Equipment
6.1.1 The delivery of the Equipment listed in Appendix 3 shall be completed within ____ ( ) months from the Effective Date of the Contract.
6.1.2 Within ____ ( ) months after the Effective Date of the Contract, the Seller shall send to the Buyer a preliminary delivery schedule by fax.
Not later than ____ ( ) days before the first shipment, the Seller shall submit to the Buyer the final delivery schedule in three (3) copies indicating Contract number, dispatch number, name of the Equipment, quantity, approximate dimensions, volume of each package and time of each shipment.
6.1.3 The port of shipment is ____, while the port of destination is ____.
6.1.4 Advance shipment, partial shipment and transshipment are allowed, however, the Seller shall inform the Buyer thirty (30) days before such shipment.
6.1.5 The date of Bill of Lading for each shipment shall be considered as the actual delivery date.
6.1.6 The Seller shall notify the Buyer by fax of the following within five (5) working days after each shipment is effected:
(a) Contract number
(b) Name of the vessel and loading port
(c) Name of the Equipment shipped
(d) Number and date of Bill of Lading
(e) Total volume
(f) Total gross and net weight
(g) Total number of packages/cases
6.1.7 The Seller shall airmail the following documents in duplicate to the Buyer:
(a) Bill of Lading
(b) Commercial Invoice
(c) Packing List
(d) Certificate of Origin
(e) Insurance Policy.
6.2 The Late Delivery of the Equipment
6.2.1 If the Seller fails to deliver the Equipment in accordance with the final delivery schedule, the Seller shall pay to the Buyer liquidated damages for such delay at the following rates:
(a) From the first week to the fourth week, the liquidated damages shall be
____ ( ) percent of the value of the delayed portion of the Equipment per
week
(b) From the fifth week to the eighth week, the liquidated damages shall be
____ ( ) percent of the value of the delayed portion of the Equipment per week
(c) From the ninth week, the liquidated damages shall be ____ ( ) percent of
the value of the delayed portion of the Equipment per week
6.2.2 The fractions of four days or more shall be counted as one week and fractions of less than four days shall be omitted. The total aggregate amount of the liquidated damages shall not exceed ____ ( ) percent of the value of the delayed portion Equipment.
6.2.3 The Seller shall be released from the liability to the Buyer whatsoever in respect of the late delivery after his payment of liquidated damages in accordance with Article 6.2. Notwithstanding the Seller’s payment of the liquidated damages for the late delivery Equipment, the Seller shall not be released from his obligation to deliver the Equipment.
6.3 The Delivery of the Technical Documentation
6.3.1 The Technical Documentation listed in Appendix 4 shall be delivered CIP ____airport by air within ____ ( ) months after the Effective Date of the Contract.
6.3.2 The date of airway bill shall be regarded as the actual delivery date of the Technical Documentation.
6.3.3 Within ____ ( ) working days after sending each lot of the Technical Documentation, the Seller shall inform the Buyer of the Contract number, item number, number and date of airway bill and the flight.
英文合同 篇3
Buyer: 买方:
Add.: 地址:
Seller: 卖方:
Add.: 地址:
This purchase contract (hereafter abbreviated “contract”) is signed by and between the Buyer and the Seller upon equal negotiations based on the Contract Law of P..R .China and other relevant laws and regulations.. Both parties agree to sell and buy goods on following terms and conditions.
此销售合同(以下简称“合同”)根据 <<中华人民共和国合同法>>及相关法律法规并经由买卖双方经平等协商后共同签定,买方与卖方均同意以下条款和条件购买和出售货物。
1. COMMODITY NAME品名:Work glves 劳保手套
SPECIFICATION AND PRICE 规格与价格:
Grey cow split leather .The leather palm is to measure 205 mm from the tip of the middle finger to the wrist and 125 mm hand wide.
灰色牛革质料。皮革掌面从手指到腕部205毫米,掌宽125毫米。
PRICE OF PAIR: 价格:每双:6元人民币
QUANTITY: 4000 pair 数量:4000双
TOTAL AMOUNT: 总价:
2. Delivery: 交货方式:
Description, quantity, unit price, total amount and other details of the goods ordered please refer to detail order, invoice and packing list. The name of the issuing company of invoice must be the same as the seller.
采购品名、规格、数量、单价、总价、交期等参考每次采购相应订单、发票及装运单,发票的填开单位必须与本合同中卖方的名称相一致。
The seller shall deliver the goods to the warehouse as previously agreed between the two parties.卖方应把货物送交至双方事先约定的仓库购销合同中英文模板购销合同中英文模板。
3. QUALITY INSPECTIN 质量检验
The quality of all the garments shall answer for the updated, valid Standard of the Nation and the industry. In case the garments are unqualified or for other reason that shall ascribe the seller’s fault, which brings losses of or damages (including but not limited to fine, expropriate, damage to Goodwill, lawyer’s fee and other losses for the buyer ’s breach of law or contract because of the seller fault) to the buyer, the buyer shall has the right to ask seller for damages.
所有手套质量应符合最新、有效的国家标准、行业标准的规定,若卖方交付的手套质量不合格或其他任何可归咎于卖方的责任导致买方遭受的任何损失(包括但不限于罚没款、扣款、商誉损失、律师费及其他因卖方原因导致买方违约、违法所遭受的损失),买方有权要求卖方承担。
Seller shall provide 7 original copies of "Approved" Quality Inspection Certificate for each leather used to produce 7 days before the delivery date. The certificate must be issued by a Chinese official quality testing department, the samples that the seller send to quality test lab shall be representative, can represent the quality of the goods, and the test must follow the Basic Standard and include the composition of the fabric. The buyer will settle the payment according to the contract after received the test report and other related documentations (Packing list, Invoice of Goods etc.).
卖方应于交货日 七 日前向买方提供由中国官方质检部门认可的质检机构出具的所有用来制作。手套的面料的合格质检报告原件 7 份,卖方向质检机构送检的样品应具有代表性,能够代表大货质量,质检报告应包含国家标准的安全技术要求事项。买方在收到质检报告、装箱单、货物发票等其他文件后按合同约定付款。
4.PAYMENT 支付
For all the goods, the seller shall issue invoice to the buyer, the invoice shall be invoiced to: Co., Ltd
所有货物应由卖方向买方开具发票,发票抬头需开列买方单位名称为 。
Kind of invoice issued: People’s Republic of China VAT invoice
发票开立种类:中华人民共和国增值税专用发票。
Terms of Payment: Total amount of payment of goods shall be paid in RMB within 30 days issued the invoices.
付款方式:买方向卖方所订购的货物款项皆以人民币支付,具发票后30天内支付本合同的100%货款。
Upon signing the contract, the seller shall provide bank information for the buyer to effect payment.
买卖双方签定订购合同后,卖方需提供公司银行资料给予买方支付货款.
WiseMedia
Payee:
帐户名称
Bank:
开户银行
A/C No.:
开户帐号
5. Intellectual Property Right 知识产权
All the goods, documents and materials that the Seller gets to may concerns intellectual property right of the buyer may contains trade marks, copyright and business secret of the buyer. The seller shall keep secret and shall procure that its employee, agent and any other persons who may have access to the above-mentioned information keep confidentiality and shall not use it for any purpose at any time or disclose to any third party. The seller shall not sell, transfer any products or materials to any third party except for the buyer that concerns trade marks, other logo or marks, copyright and other intellectual property right of the buyer, even if for the out season products, substandard products, rest products and unused/waste products or materials. In case the seller breaches, the buyer has the right to ask for indemnification including but not limited investigation fees, lawyer’s fees,compensation as well as all other fees according to the stipulations or Chinese laws.
卖方接触到的买方的物品、文件资料均可能涉及买方及其关联公司的知识产权,尤其是可能包含的买方商标、著作权及商业秘密购销合同中英文模板合同范本。卖方应对其知悉的买方及其关联公司的商业秘密进行保密,并应促使卖方所有接触到买方秘密信息的.任何雇员、代理人、客户或其他人士对该信息保密,不得在任何时候为任何目的使用或者向任何第三人披露。卖方不得向除买方及任何单位和个人销售、转让涉及买方及商标、标识标记、著作权等知识产权的产品或资料,即使对于过季品、等外品、富余品和废弃不用的产品或资料也不例外。若卖方违反约定,买方有权根据约定及中国法律规定要求卖方承担包括但不限于调查费、律师费、赔偿金在内的一切赔偿责任。
7. DISPUTE AND OTHER 争议解决及其他
Both parties will try to resolve any dispute concerning the contract amicably. If the dispute can not be resolved by negotiation, any party may initial legal action.
买卖双方在履行本合同时如有争议应先以友好协商方式解决,如协商不成买卖双方可将争议送交由提出诉讼方所在地之人民法院进行诉讼.
All appendixes to this contract should be bonded to the contract as a whole.
本合同所附带之所有附件及附带协议或合同将作为本合同不可分离之一部份.
The contract includes two originals signed by the authorized signatories from each party on the following date, each party shall retain one fully signed originals and each copy has equal legal effect.
需由买卖双方授权代表在以下日期签属一式两份原件,买卖双方各持有一份完整并经过签属完整的合同,买卖双方所持有之合同并具同等法律效力.。
This agreement is written in one form of two versions in English and Chinese, if both versions of English and Chinese are found inconsistent, the Chinese version should be the basis to follow.
本合同为中英文版本书写, 如合同条款有中英文本不一致之处则以中文为准.
Seller: Seller:
卖方: 买方:
Authorized representative: Authorized representative:
授权代表 授权代表
Signature: Signature:
签名: 签名:
Stamp: Stamp:
盖章: 盖章:
Date: Date:
日期: 日期:
英文合同 篇4
编号: no:
日期: date :
签约地点: signed at:
卖方:sellers:
地址:address: 邮政编码:postal code:
电话:tel:传真:fax:
买方:buyers:
地址:address: 邮政编码:postal code:
电话:tel:传真:fax:
买卖双方同意按下列条款由卖方出售,买方购进下列货物:
the sellers agrees to sell and the buyer agrees to buy the undermentioned goods on the terms and conditions stated below:
1 货号article no.
2 品名及规格description&specification
3 数量 quantity
4 单价unit price
5 总值:
数量及总值均有_____%增减,由卖方决定。
total amount
with _____% more or less both in amount and quantity allowed at the sellers option.
6 生产国和制造厂家country of origin and manufacturer
7 包装:packing:
8 唛头:shipping marks:
9 装运期限:time of shipment:
10 装运口岸:port of loading:
11 目思的口岸:port of destination:
12 保险:由卖方按发票全额110%投保至_____为止_____险。
insurance:to be effected by buyers for 110% of full invoice value covering _____ up to _____ only.
13 付款条件:
买方须于_____年_____月_____日将保兑,不可撤销,可转让可分割即期信用证开到卖方。 信用证议付有效期延至上列装运期后15天在中国到期,该信用证中必须注明允许分运及转运。
payment:
by confirmed, irrevocable, transferable and divisible l/c to be available by sight draft to reach the sellers before ___/___/_____ and to remainvalid for ingotiation in china until 15 days after the aforesaid time of shipment. tje l/c must specify that transhipmeent and partial shipments are allowed.
14 单据:documents:
15 装运条件:terms of shipment:
16 品质与数量、重量异义与索赔:quality/quantity discrepancy and claim:
英文合同 篇5
Purchase Contract
合同编号(Contract No.): _______________
签订日期(Date) :___________ 签订地点(Signed at) :___________
买方:__________________________
The Buyer:________________________
地址: __________________________
Address: _________________________
电话(Tel):___________ 传真(Fax):__________
电子邮箱(E-mail):______________________
卖方:___________________________
The Seller:_________________________
地址:___________________________
Address: __________________________
电话(Tel):_________ 传真(Fax):___________
电子邮箱(E-mail):______________________
买卖双方同意按照下列条款签订本合同:
The Seller and the Buyer agree to conclude this Contract subject to the terms and conditions stated below:
1. 货物名称、规格和质量(Name, Specifications and Quality of Commodity):
2. 数量(Quantity):
允许____的溢短装(___% more or less allowed)
3. 单价(Unit Price):
4. 总值(Total Amount):
5. 交货条件(Terms of Delivery) FOB/CFR/CIF_______
6. 原产地国与制造商 (Country of Origin and Manufacturers):
7. 包装及标准(Packing):
货物应具有防潮、防锈蚀、防震并适合于远洋运输的包装,由于货物包装不良而造成的货物残损、灭失应由卖方负责。卖方应在每个包装箱上用不褪色的颜色标明尺码、包装箱号码、毛重、净重及“此端向上”、“防潮”、“小心轻放”等标记。
The packing of the goods shall be preventive from dampness, rust, moisture, erosion and shock, and shall be suitable for ocean transportation/ multiple transportation. The Seller shall be liable for any damage and loss of the goods attributable to the inadequate or improper packing. The measurement, gross weight, net weight and the cautions such as "Do not stack up side down", "Keep away from moisture", "Handle with care" shall be stenciled on the surface of each package with fadeless pigment.
8. 唛头(Shipping Marks):
9. 装运期限(Time of Shipment):
10. 装运口岸(Port of Loading):
11. 目的口岸(Port of Destination):
12. 保险(Insurance):
由____按发票金额110%投保_____险和_____附加险。
Insurance shall be covered by the ________ for 110% of the invoice value against _______ Risks and __________ Additional Risks.
13. 付款条件(Terms of Payment):
(1) 信用证方式:买方应在装运期前/合同生效后__日,开出以卖方为受益人的不可撤销的议付信用证,信用证在装船完毕后__日内到期。
Letter of Credit: The Buyer shall, ______ days prior to the time of shipment /after this Contract comes into effect, open an irrevocable Letter of Credit in favor of the Seller. The Letter of Credit shall expire ____ days after the completion of loading of the shipment as stipulated.
(2) 付款交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,按即期付款交单(D/P)方式,通过卖方银行及_____银行向买方转交单证,换取货物。
Documents against payment: After shipment, the Seller shall draw a sight bill of exchange on the Buyer and deliver the documents through Sellers bank and ______ Bank to the Buyer against payment, i.e D/P. The Buyer shall effect the payment immediately upon the first presentation of the bill(s) of exchange.
(3) 承兑交单:货物发运后,卖方出具以买方为付款人的付款跟单汇票,付款期限为____后__日,按即期承兑交单(D/A__日)方式,通过卖方银行及______银行,经买方承兑后,向买方转交单证,买方在汇票期限到期时支付货款。
Documents against Acceptance: After shipment, the Seller shall draw a sight bill of exchange, payable_____ days after the Buyers delivers the document through Seller’s bank and _________Bank to the Buyer against acceptance (D/A ___ days). The Buyer shall make the payment on date of the bill of exchange.
(4) 货到付款:买方在收到货物后__天内将全部货款支付卖方(不适用于FOB、CRF、CIF术语)。
Cash on delivery (COD): The Buyer shall pay to the Seller total amount within ______ days after the receipt of the goods (This clause is not applied to the Terms of FOB, CFR, CIF).
14. 单据(Documents Required):
卖方应将下列单据提交银行议付/托收:
The Seller shall present the following documents required to the bank for negotiation/collection:
(1) 标明通知收货人/受货代理人的全套清洁的、已装船的、空白抬头、空白背书并注明运费已付/到付的海运/联运/陆运提单。
Full set of clean on board Ocean/Combined Transportation/Land Bills of Lading and blank endorsed marked freight prepaid/ to collect;
(2) 标有合同编号、信用证号(信用证支付条件下)及装运唛头的商业发票一式__份; Signed commercial invoice in ______copies indicating Contract No., L/C No. (Terms of L/C) and shipping marks;
(3) 由______出具的装箱或重量单一式__份;
Packing list/weight memo in ______ copies issued by__;
(4) 由______出具的质量证明书一式__份;
Certificate of Quality in _______ copies issued by____;
(5) 由______出具的数量证明书一式__份;
Certificate of Quantity in ___ copies issued by____;
(6) 保险单正本一式__份(CIF 交货条件);
Insurance policy/certificate in ___ copies (Terms of CIF);
(7)____签发的产地证一式__份;
Certificate of Origin in ___ copies issued by____;
(8) 装运通知(Shipping advice): 卖方应在交运后_____小时内以特快专递方式邮寄给买方上述第__项单据副本一式一套。
The Seller shall, within ____ hours after shipment effected, send by courier each copy of the above-mentioned documents No. __.
15. 装运条款(Terms of Shipment):
(1) FOB交货方式
卖方应在合同规定的装运日期前30天,以____方式通知买方合同号、品名、数量、金额、包装件、毛重、尺码及装运港可装日期,以便买方安排租船/订舱。装运船只按期到达装运港后,如卖方不能按时装船,发生的空船费或滞期费由卖方负担。在货物越过船弦并脱离吊钩以前一切费用和风险由卖方负担。
The Seller shall, 30 days before the shipment date specified in the Contract, advise the Buyer by _______ of the Contract No., commodity, quantity, amount, packages, gross weight, measurement, and the date of shipment in order that the Buyer can charter a vessel/book shipping space. In the event of the Seller"s failure to effect loading when the vessel arrives duly at the loading port, all expenses including dead freight and/or demurrage charges thus incurred shall be for the Seller"s account.
(2) CIF或CFR交货方式
卖方须按时在装运期限内将货物由装运港装船至目的.港。在CFR术语下,卖方应在装船前2天以____方式通知买方合同号、品名、发票价值及开船日期,以便买方安排保险。
The Seller shall ship the goods duly within the shipping duration from the port of loading to the port of destination. Under CFR terms, the Seller shall advise the Buyer by _________ of the Contract No., commodity, invoice value and the date of dispatch two days before the shipment for the Buyer to arrange insurance in time.
16. 装运通知(Shipping Advice):
一俟装载完毕,卖方应在__小时内以____方式通知买方合同编号、品名、已发运数量、发票总金额、毛重、船名/车/机号及启程日期等。
The Seller shall, immediately upon the completion of the loading of the goods, advise the Buyer of the Contract No., names of commodity, loading quantity, invoice values, gross weight, name of vessel and shipment date by _________ within ________hours.
17. 质量保证(Quality Guarantee):
货物品质规格必须符合本合同及质量保证书之规定,品质保证期为货到目的港__个月内。在保证期限内,因制造厂商在设计制造过程中的缺陷造成的货物损害应由卖方负责赔偿。 The Seller shall guarantee that the commodity must be in conformity with the quatity,
specifications and quantity specified in this Contract and Letter of Quality Guarantee. The guarantee period shall be ______ months after the arrival of the goods at the port of destination, and during the period the Seller shall be responsible for the damage due to the defects in designing and manufacturing of the manufacturer.
18. 检验(Inspection) (以下两项任选一项):
(1)卖方须在装运前__日委托______检验机构对本合同之货物进行检验并出具检验证书,货到目的港后,由买方委托________检验机构进行检验。
The Seller shall have the goods inspected by ______ days before the shipment and have the Inspection Certificate issued by____. The Buyer may have the goods reinspected by ________ after the goods?rrival at the destination.
(2) 发货前,制造厂应对货物的质量、规格、性能和数量/重量作精密全面的检验,出具检验证明书,并说明检验的技术数据和结论。货到目的港后,买方将申请中国商品检验局(以下简称商检局)对货物的规格和数量/重量进行检验,如发现货物残损或规格、数量与合同规定不符,除保险公司或轮船公司的责任外,买方得在货物到达目的港后__日内凭商检局出具的检验证书向卖方索赔或拒收该货。在保证期内,如货物由于设计或制造上的缺陷而发生损坏或品质和性能与合同规定不符时,买方将委托中国商检局进行检验。
The manufacturers shall, before delivery, make a precise and comprehensive inspection of the goods with regard to its quality, specifications, performance and quantity/weight, and issue inspection certificates certifying the technical data and conclusion of the inspection. After arrival of the goods at the port of destination, the Buyer shall apply to China Commodity Inspection Bureau (hereinafter referred to as CCIB) for a further inspection as to the specifications and quantity/weight of the goods. If damages of the goods are found, or the specifications and/or quantity are not in conformity with the stipulations in this Contract, except when the responsibilities lies with Insurance Company or Shipping Company, the Buyer shall, within _____ days after arrival of the goods at the port of destination, claim against the Seller, or reject the goods according to the inspection certificate issued by CCIB. In case of damage of the goods incurred due to the design or manufacture defects and/or in case the quality and performance are not in conformity with the Contract, the Buyer shall, during the guarantee period, request CCIB to make a survey.
19. 索赔(Claim):
买方凭其委托的检验机构出具的检验证明书向卖方提出索赔(包括换货),由此引起的全部费用应由卖方负担。若卖方收到上述索赔后______天未予答复,则认为卖方已接受买方索赔。
The buyer shall make a claim against the Seller (including replacement of the goods) by the further inspection certificate and all the expenses incurred therefrom shall be borne by the Seller. The claims mentioned above shall be regarded as being accepted if the Seller fail to reply within ______days after the Seller received the Buyer"s claim.
20. 迟交货与罚款(Late delivery and Penalty):
除合同第21条不可抗力原因外,如卖方不能按合同规定的时间交货,买方应同意在卖方支付罚款的条件下延期交货。罚款可由议付银行在议付货款时扣除,罚款率按每__天收__%,不足__天时以__天计算。但罚款不得超过迟交货物总价的____%。如卖方延期交货超过合同规定__天时,买方有权撤销合同,此时,卖方仍应不迟延地按上述规定向买方支付罚款。
买方有权对因此遭受的其它损失向卖方提出索赔。
Should the Seller fail to make delivery on time as stipulated in the Contract, with the exception of Force Majeure causes specified in Clause 21 of this Contract, the Buyer shall agree to postpone the delivery on the condition that the Seller agree to pay a penalty which shall be deducted by the paying bank from the payment under negotiation. The rate of penalty is charged at______% for every ______ days, odd days less than _____days should be counted as ______ days. But the penalty, however, shall not exceed_______% of the total value of the goods involved in the delayed delivery. In case the Seller fail to make delivery ______ days later than the time of shipment stipulated in the Contract, the Buyer shall have the right to cancel the Contract and the Seller, in spite of the cancellation, shall nevertheless pay the aforesaid penalty to the Buyer without delay.
The buyer shall have the right to lodge a claim against the Seller for the losses sustained if any.
21. 不可抗力(Force Majeure):
凡在制造或装船运输过程中,因不可抗力致使卖方不能或推迟交货时,卖方不负责任。在发生上述情况时,卖方应立即通知买方,并在__天内,给买方特快专递一份由当地民间商会签发的事故证明书。在此情况下,卖方仍有责任采取一切必要措施加快交货。如事故延续__天以上,买方有权撤销合同。
The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The Seller shall advise the Buyer immediately of the occurrence mentioned above and within_____ days thereafter the Seller shall send a notice by courier to the Buyer for their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the Seller, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than _____ days the Buyer shall have the right to cancel the Contract.
22. 争议的解决 (Arbitration):
凡因本合同引起的或与本合同有关的任何争议应协商解决。若协商不成,应提交中国国际经济贸易仲裁委员会深圳分会,按照申请仲裁时该会现行有效的仲裁规则进行仲裁。仲裁裁决是终局的,对双方均有约束力。
Any dispute arising from or in connection with the Contract shall be settled through friendly negotiation. In case no settlement is reached, the dispute shall be submitted to China International Economic and Trade Arbitration Commission (CIETAC),Shenzhen Commission for arbitration in accordance with its rules in effect at the time of applying for arbitration. The arbitral award is final and binding upon both parties.
23. 通知(Notices):
所有通知用____文写成,并按照如下地址用传真/电子邮件/快件送达给各方。如果地址有变更,一方应在变更后__日内书面通知另一方。
All notice shall be written in _____ and served to both parties by fax/courier according to the following addresses. If any changes of the addresses occur, one party shall inform the other party of the change of address within ____days after the change.
24. 本合同使用的FOB、CFR、CIF术语系根据国际商会《20xx年国际贸易 术语解释通则》。
The terms FOB、CFR、CIF in the Contract are based on INCOTERMS 20xx of the
英文合同 篇6
出租方(甲方)Lessor (hereinafter referred to as Party A) :
承租方(乙方)Lessee (hereinafter referred to as Party B) :
根据国家有关法律、法规和有关规定,甲、乙双方在平等自愿的基础上,经友好协商一致,就甲方将其合法拥有的房屋出租给乙方使用,乙方承租使用甲方房屋事宜,订立本合同。
In accordance with relevant Chinese laws 、decrees and pertinent rules and regulations ,Party A and Party B have reached an agreement through friendly consultation to conclude the following contract.
一、 物业地址 Location of the premises
甲方将其所有的位于上海市_________区____________________________________的房屋及其附属设施在良好状态下出租给乙方___________使用。
Party A will lease to Party B the premises and attached facilities all owned by Party A itself, which is located at _______________________________________ __________________________ and in good condition for_____________ .
二、 房屋面积 Size of the premises
出租房屋的登记面积为_________平方米(建筑面积)。
The registered size of the leased premises is_________square meters (Gross size).
三、 租赁期限 Lease term
租赁期限自_______年___月___日起至_______年___月___日止,为期___年,甲方应于_______年___月___日将房屋腾空并交付乙方使用。
The lease term will be from _____(month) _____(day) _______(year) to ________(month) _____(day) _______(year). Party A will clear the premises and provide it to Party B for use before _____(month) _____(day) _______(year).
四、 租金 Rental
1. 数额:双方商定租金为每月人民币_____________元整, 乙方以___________形式支付给甲方 。
Amount: the rental will be ____________per month. Party B will pay the rental
to Party A in the form of ____________in ________________.
2. 租金按_____月为壹期支付;第一期租金于_______年_____月_____日以前付清;以后每期租金于每月的______日以前缴纳,先付后住(若乙方以汇款形式支付租金,则以汇出日为支付日,汇费由汇出方承担)。甲方收到租金后予书面签收。
Payment of rental will be one installment everymonth(s). The first installment will be paid before_______(month)______(day)__________(year). Each successive installment will be paid_____________each month.
Party B will pay the rental before using the premises and attached facilities (In case Party B pays the rental in the form of remittance, the date of remitting will be the day of payment and the remittance fee will be borne by the remitter.) Party A will issue a written receipt after receiving the payment.
3. 如乙方逾期支付租金超过十天,则每天以月租金的0.5%支付滞纳金;如乙方逾期支付租金超过十五天,则视为乙方自动退租,构成违约,甲方有权收回房屋,并追究乙方违约责任。
In case the rental is more than ten working days overdue, Party B will pay 0.5 percent of monthly rental as overdue fine every day, if the rental be paid 15 days overdue, Party B will be deemed to have with drawn from the premises and breach the contract. In this situation, Party A has the right to take back the premises and take actions against party B"s breach.
五、 保证金 Deposit
1. 为确保房屋及其附属设施之安全与完好,及租赁期内相关费用之如期结算,乙方同意于______年_____月_____日前支付给甲方保证金人民币 _________元整,甲方在收到保证金后予以书面签收。
Guarantying the safety and good conditions of the premises and attached facilities and account of relevant fees are settled on schedule during the lease term, party B will pay _________to party A as a deposit before _____(month) _____(day) _______(year). Party A will issue a written receipt after receiving the deposit.
2. 除合同另有约定外,甲方应于租赁关系消除且乙方迁空、点清并付清所有应付费用后的.当天将保证金全额无息退还乙方。
Unless otherwise provided for by this contract, Party A will return full amount of the deposit without interest on the day when this contract expires and party B clears the premises and has paid all due rental and other expenses.
3. 因乙方违反本合同的规定而产生的违约金、损坏赔偿金和其它相关费用,甲方可在保证金中抵扣,不足部分乙方必须在接到甲方付款通知后十日内补足。
In case party B breaches this contract, party A has right to deduct the default fine, compensation for damage or any other expenses from the deposit . In case the deposit is not sufficient to cover such items, Party B should pay the insufficiency within ten days after receiving the written notice of payment from Party A.
六、 甲方义务 Obligations of Party A
1. 甲方须按时将房屋及附属设施(详见附件)交付乙方使用。
Party A will provide the premises and attached facilities (see the appendix of furniture list for detail) on schedule to Party B for using.
2. 房屋设施如因质量原因、自然损耗或灾害而受到损坏,甲方有修缮并承担相关费用的责任。
In case the premise and attached facilities are damaged by quality problems, natural damages or disasters, Party A will be responsible to repair and pay the relevant expenses.
3. 甲方应确保出租的房屋享有出租的权利,反之如乙方权益因此遭受损害,甲方应负赔偿责任。
Party A will guarantee the lease right of the premises. Otherwise, Party A will be responsible to compensate Party B"s losses.
七、 乙方义务 Obligations of Party B
1. 乙方应按合同的规定按时支付定金、租金及保证金。
Party B will pay the rental, the deposit and other expenses on time.
2. 乙方经甲方同意,可在房屋内添置设备。租赁期满后,乙方将添置的设备搬走,并保证不影响房屋的完好及正常使用。
Party B may decorate the premises and add new facilities with Party A"s approval. When this contract expires, Party B may take away the added facilities which are removable without changing the good conditions of the premises for normal use.
3. 未经甲方同意,乙方不得将承租的房屋转租或分租,并爱护使用该房屋如因乙方过失或过错致使房屋及设施受损,乙方应承担赔偿责任。
Party B will not transfer the lease of the premises or sublet it without Party A"s approval and should take good care of the premises. Otherwise, Party B will be responsible to compensate any damages of the premises and attached facilities caused by its fault and negligence.
4. 乙方应按本合同规定合法使用该房屋,不得擅自改变使用性质。乙方不得在该房屋内存放危险物品。否则,如该房屋及附属设施因此受损,乙方应承担全部责任。
Party B will use the premises lawfully according to this contract without changing the nature of the premises and storing hazardous materials in it. Otherwise, Party B will be responsible for the damages caused by it
5. 乙方应承担租赁期内的水、电、煤气、电讯、收视费、等一切因实际使用而产生的费用,并按单如期缴纳。
Party B will bear the cost of utilities such as communications, water, electricity, gas, management fee etc. on time during the lease term.
八、 合同终止及解除的规定 Termination and dissolution of the contract
1. 乙方在租赁期满后如需退租或续租,应提前两个月通知甲方,由双方另行协商退租或续租事宜。在同等条件下乙方享有优先续租权。
Within two months before the contract expires, Party B will notify Party A if it intends to extend the leasehold. In this situation, two parties will discuss matters over the extension.
2. 租赁期满后,乙方应在当天将房屋交还甲方;任何滞留物,如未取得甲方谅解,均视为放弃,任凭甲方处置,乙方决无异议。
When the lease term expires, Party B will return the premises and attached facilities to Party A within days. Any belongings left in it without Party A"s previous understanding will be deemed to be abandoned by Party B. In this situation, Party A has the right to dispose of it and Party A will raise no objection.
3. 本合同一经双方签字后立即生效;未经双方同意,不得任意终止,如有未尽事宜,甲、乙双方可另行协商。
This contract will be effective after being signed by both parties. Any party has no right to terminate this contract without another party"s agreement. Anything not covered in this contract will be discussed separately by both parties
九、 违约及处理 Breach of the contract
1. 甲、乙双方任何一方在未征得对方谅解的情况下,不履行本合同规定条款,导致本合同中途中止,则视为该方违约,双方同意违约金为人民币___________元整,若违约金不足弥补无过错方之损失,则违约方还需就不足部分支付赔偿金。
During the lease term, any party who fails to fulfill any article of this contract without the other party"s understanding will be deemed to breach the contract. Both parties agree that the default fine will be________________. In case the default fine is not sufficient to cover the loss suffered by the faultless party, the party in breach should pay additional compensation to the other party.
2. 若双方在执行本合同或与本合同有关的事情时发生争议,应首先友好协商;协商不成,可向有管辖权的人民法院提起诉讼。本合同一经双方签字后立即生效;未经双方同意,不得任意终止,如有未尽事宜,甲、乙双方可另行协商。
Both parties will solve the disputes arising from execution of the contract or in connection with the contract through friendly consultation. In case the agreement cannot be reached, any party may summit the dispute to the court that has the jurisdiction over the matter.
十、 其他 Miscellaneous
1. 本合同附件是本合同的有效组成部分,与本合同具有同等法律效力。
Any annex is the integral part of this contract. The annex and this contract are equally valid.
2. 本合同壹式贰份,甲、乙双方各执一份。
There are 2 originals of this contract. Each party will hold 1 original(s).
3. 甲、乙双方如有特殊约定,可在本款另行约定:
Other special terms will be listed bellows:
______________________________________________
甲 方:Party A
乙方:Party B
签订日期:date of signing
英文合同 篇7
编号: no:
日期: date :
签约地点: signed at:
卖方:sellers:
地址:address: 邮政编码:postal code:
电话:tel: 传真:fax:
买方:buyers:
地址:address: 邮政编码:postal code:
电话:tel: 传真:fax:
买卖双方同意按下列条款由卖方出售,买方购进下列货物:
the sellers agrees to sell and the buyer agrees to buy the undermentioned goods on the terms and conditions stated below:
1 货号 article no.
2 品名及规格 description&specification
3 数量 quantity
4 单价 unit price
5 总值:
数量及总值均有_____%的增减,由卖方决定。
total amount
with _____% more or less both in amount and quantity allowed at the sellers option.
6 生产国和制造厂家 country of origin and manufacturer
7 包装: packing:
8 唛头: shipping marks:
9 装运期限:time of shipment:
10 装运口岸:port of loading:
11 目的口岸:port of destination:
12 保险:由卖方按发票全额110%投保至_____为止的_____险。
insurance:to be effected by buyers for 110% of full invoice value covering _____ up to _____ only.
13 付款条件:
买方须于_____年_____月_____日将保兑的,不可撤销的,可转让可分割的即期信用证开到卖方。 信用证议付有效期延至上列装运期后15天在中国到期,该信用证中必须注明允许分运及转运。
payment:
by confirmed, irrevocable, transferable and divisible l/c to be available by sight draft to reach the sellers before ___/___/_____ and to remainvalid for ingotiation in china until 15 days after the aforesaid time of shipment. tje l/c must specify that transhipment and partial shipments are allowed.
14 单据:documents:
15 装运条件:terms of shipment:
16 品质与数量、重量的"异义与索赔:quality/quantity discrepancy and claim:
17 人力不可抗拒因素:
由于水灾、火灾、地震、干旱、战争或协议一方无法预见、控制、避免和克服的其他事件导致不能或暂时不能全部或部分履行本协议,该方不负责任。但是,受不可抗力事件影响的一方须尽快将发生的事件通知另一方,并在不可抗力事件发生15天内将有关机构出具的不可抗力事件的证明寄交对方。
force majeure:
either party shall not be held responsible for failure or delay to perform all or any part of this agreement due to flood, fire, earthquake, draught, war or any other events which could not be predicted, controlled, avoided or overcome by the relative party. however, the party affected by the event of force majeure shall inform the other party of its occurrence in writing as soon as possible and thereafter send a certificate of the event issued by the relevant authorities to the other party within 15 days after its occurrence.
18 仲裁:
在履行协议过程中,如产生争议,双方应友好协商解决。若通过友好协商未能达成协议,则提交中国国际贸易促进委员会对外贸易仲裁委员会,根据该会仲裁程序暂行规定进行仲裁。该委员会决定是终局的,对双方均有约束力。仲裁费用,除另有规定外,由败诉一方负担。 arbitration
all disputes arising from the execution of this agreement shall be settled through friendly consultations. in case no settlement can be reached, the case in dispute shall then be submitted to the foreign trad arbitration commission of the china council for the promotion of international trade for arbitration in accordance with its provisional rules of procedure. the decesion made by this commission shall be regarded as final and binding upon both parties. arbitration fees shall be borne by the losing party, unless otherwise awarded.
英文合同 篇8
合 同 CONTRACT
日期:
合同号码: Date: Contract No.:
买 方: (The Buyers)
卖方: (The Sellers)
兹经买卖双方同意按照以下条款由买方购进,卖方售出以下商品: This contract is made by and between the Buyers and the Sellers; whereby the Buyers agree to buy and the Sellers agree to sell the under-mentioned goods subject to the terms and conditions as stipulated hereinafter:
(1) 商品名称: Name of Commodity:
(2) 数 量: Quantity:
(3) 单 价: Unit price:
(4) 总 值: Total Value:
(5) 包 装: Packing:
(6) 生产国别: Country of Origin :
(7) 支付条款: Terms of Payment:
(8) 保 险: Insurance:
(9) 装运期限: Time of Shipment:
(10) 起 运 港: Port of Lading:
(11) 目 的 港: Port of Destination:
(12)索赔:在货到目的口岸45天内如发现货物品质,规格和数量与合同不符,除属保险公司或船方责任外,买方有权凭中国商检出具的`检验证书或有关文件向卖方索赔换货或赔款。 Claims: Within 45 days after the arrival of the goods at the destination, should the quality, Specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable. The Buyers shall, have the right on the strength of the inspection certificate issued by the C.C.I.C and the relative documents to claim for compensation to the Sellers.
(13)不可抗力:由于人力不可抗力的原由,发生在制造、装载或运输的过程中导致卖方延期交货或不能交货者,卖方可免除责任。在不可抗力发生后,卖方须立即电告买方及在14天内以空邮方式向买方提供事故发生的证明文件,在上述情况下,卖方仍须负责采取措施尽快发货。 Force Majeure: The sellers shall not be held responsible for the delay in shipment or non-deli-very of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The sellers shall advise the Buyers immediately of the occurrence mentioned above the within fourteen days there after. The Sellers shall send by airmail to the Buyers for their acceptance certificate of the accident. Under such circumstances the Sellers, however, are still under the obligation to take all necessary measures to hasten the delivery of the goods.
(14)仲裁:凡有关执行合同所发生的一切争议应通过友好协商解决,如协商不能解决,则将分歧提交中国国际贸易促进委员会按有关仲裁程序进行仲裁,仲裁将是终局的,双方均受其约束,仲裁费用由败诉方承担。 Arbitration: All disputes in connection with the execution of this Contract shall be settled friendly through negotiation. In case no settlement can be reached, the case then may be submitted for arbitration to the Arbitration Commission of the China Council for the Promotion of International Trade in accordance with the Provisional Rules of Procedure promulgated by the said Arbitration Commission. The Arbitration committee shall be final and binding upon both parties. And the Arbitration fee shall be borne by the losing parties.
买方: 卖方:
(授权签字) (授权签字)
英文合同 篇9
一、出租人: (“甲方”)
landlord: (part a )
二、承租人: (“乙方”)
tenant: (part b )
三、租赁范围及用途:
tenancy:
3.1 甲方同意将其所有的位于_________________________________________的房屋在良好及可租赁的状态下租给乙方为居住使用。
party a hereby agrees to lease its property located at
___________________________________in good and tenantable condition to party b for residential use.
3.2 乙方应将出租房屋用作住宅用房。
the leased property shall be used by part b for residential purpose.
四、租赁期:
term of tenancy:
4.1 租赁期为_____年,自 年 月____日起至_______年____月____日止。
the tenancy shall be for a term of years,commencing on ______________and expiring on __________________.
4.2 租赁期满,如乙方不再根据此条款续约,甲方有权收回全部出租房屋,乙方应如
期交换出租房屋予甲方。乙方如要求续租,须在本合同期满三个月前向甲方提出书面申请,再由双方另行续租事宜。
on expiry of the tenancy, if party b has not exercised its option to renew this agreement in accordance with this clause,party a has the right to repossess the entire leased property,and party b shall deliver the leased property to the party a provided always that party b shall have the option to renew this agreement upon giving prior written novice to party a of its intention to do so that least three(3) months before the expiration of this agreement.
五、租金:
rent
5.1 双方谈定的租金为每月____________________人民币,租金包括除水、电、液化气、电话费以外的一切管理费。
the rent for the leased property as agreed to by both parties is rmb___________yuan per month, which rent includes all management fee.
5.2 支付甲方壹个月的租金,应在每个月的第十天以前支付给甲方。
party b pay the rental fee before the tenth day of every calendar one month.
5.3 所有保证金、租金等费用均以人民币通过银行汇入甲方所提供的以下银行账户及户名:
账号:____________________户名:______________开户行:____________________
all payments of security deposit,rent fee,etc heteunder shall be made be made by bank transfer rmb to party a"s following account.
account no:________________________,user name:_____________bank:___ ________ __
六、保证金:
security deposit:
6.1 为确保出租房屋及其设施之安全并完好及租赁期内相关费用之如期结算,乙方同意于签订合同10天内支付给甲方贰个月租金的租赁押金计__________________人民币作为乙方确保合同履行之保证金。乙方搬入后十天内付壹个与租金计______________人民币。
to ensure the protection and good condition of the leased property and the related facilities as well as the prompt payment and settlement of all related charges during the term of tenancy,party b agrees to pay to party a with 10 days when the execution of this agreement a security for party b’s obligations hereunder. when party b move in,party b pay one month’s rental in the amount of___________with 10days.
6.2 除合同另有约定之外,甲方应于租赁期满或此合同提前终止之期且乙方透空、点清并付清所有应付费用后,当天将保证金全额无息退还乙方,如保证金以人民币支付,届时也应以人民币形式退还。
unless otherwise provided in this agreement, party a shall return to party b the entire security deposit without interest thereon upon expiration or soonder detemination of this agreement provide that party b has vzcated the leased property and settled all related charges. if this security deposit was paid in rmb,it shall be returned to party b in the form of rmb.
七、其他费用:
other charges:
乙方应承担租赁期内实际使用而产生的"水、电、液化气费、电话费并按单自行如期交纳所属管理公司或有关机构。
during the term of tenancy,party b is responsible for paying the charges in relation to water, electricity, gas,telephone charges on the basis of the amount of such utilities party b uses. such charges shall be paid when due according to the invoice therefore received by party b from the management company or relevant authority every month.
八、甲方的责任:
party a’s obligations:
8.1 甲方须按时将出租房屋及其家私家具用品与其设施以良好状态交付乙方使用。
party a shall deliver on schedule to party bvacant possession of the leased property including the furniture,furnishing and appliances and the related facilities for party b’s use(furniture,furnishing and appliances to be detailed in appendisl.)
8.2 租赁期内甲方不得收回出租房屋(除非本合同另有规定),甲方保证乙方可不受干扰的享用该物业。
party a shall not repossess the leased property during the term of party a disturb of interfere with party b’s quiet enjoyment of the leased property.
8.3 在乙方遵守本合同的条款及支付租金的前提下,乙方有权于租赁期内拒绝甲方或其他人骚扰而安静享用出租房屋。
proviede that party b pays the rent and performs and observes party b’s terms and conditions in accordavce with this agreement, party b shall be entitled to hold and enjoy the leased property throughout the term of this tenancy without any interruption by party a or any other person.
8.4 租赁期内出租房屋的结构,进出物业的排水、上下管道、电路等处于良好使用状态。
party a agrees to repair and maintain the structure,drains, pipes and cables, etc.leading in to or from the leased property at all times in good and tenable repair during the term of this tenancy.
九、乙方的责任:
party b’s obligations:
9.1 乙方应按合同的规定,按时支付租金,保证金及其他各项应付费用。
party b shall promptly pay all rent ,security deposit and other charges payable by it in accordance with the terms of this agreement.
9.2 乙方应爱护使用出租房屋,如因乙方的过失或过错致使房屋设施及屋内用具和饰品受到损坏(正常损耗除外),乙方应负赔偿责任。
paryt b shall treat the leased property with care. if as a result of party b’s negligence or misconduct, the leased property and the related facilities and accessorties suffer any damage(fair wear and tear excepted ),party b shall be responsible for compensating party a for such damages.
9.3 乙方应按本合同的约定合法使用出租房屋,不得擅自改变使用性质,不应存放中华人民共和国法律下所禁止的危险物品,如因此发生损害,乙方应承担全部责任。
party b shall use the leased property legally as agreed in this agreement and may not change such use on its own…party b shall not store any dangerous items which are prohibited by the laws in the people’s republic of china in the leased property and shall be fully responsible for any admages of losses as result thereof.
9.4 未经甲方事先书面同意,乙方不得将出租房屋转租或租给其他的第三者。
without party a’s prior written consent ,party b may not assign the tenancy or sublet the leased property to a third party.
十、违约处理:
breach of agreement :
10.1 甲、乙任何一方如未按本合同的条款履行,构成违约,应承担相应的违约责任。双方同意违约方应赔偿守约方之直接损失人民币____________元。
if either party a or party b fails to perform its obligations hereunder ,it shall constitute a breach of this agreement and the defaulting party shall be liable for the liabilities resulting from such breach. the parties agree that the party in breach shall pay the other party compensation ____________________for the direct loss and damage suffered by the other party as result of such breach .
10.2 乙方有下列行为之一的,甲方有权终止本合同,收回出租房屋,并且保证金不予返还;
party a shall have the right to terminage this agreement ,repossess the leased property and forfeit the security deposit if party b commits one of the following:
a.未得甲方书面书面同意,将出租房屋擅自转租;
sublets the leased property without party a’s written consent;
b.未得甲方同意将出租房擅自拆改结构或改变用途的:
alters the structure of the leased property or uses the leased property other than for the purpose started herein without party a’s consent;
c.无故拖欠租金超过三天(除双方就本合同存在争议除外)。
fails to pay rent without any reason for more than thirty (30)days after the due date except where there is a dispute in respect of this agreement.
十一、适用法律:
applicable law:
本合同的成立,其有效性、结实、签署和解决与其他有关的一切纠纷均应受中国法律的管辖并依据中国法律解释。
the formation of this agreement ,its validity,interpretation,executiong and settlement of any disputes arising hereunder shall be governed by and construed in accordance with the laws of the people’s republic of china.
十二、争议的解决:
dispute resolution:
凡因执行本合同所产生的或与本合同有关的一切争议,双方应通过友好协商解决;协商不成,应提交中国国际经济贸易仲裁委员会,按其仲裁规则和中华人民共和国仲裁法进行仲裁。仲裁解决是终局的,对双方都有约束力。
in the case of disputes arising over this agreement of any matters related hereto ,the parties shall negotiate in good faith to resolve such disputes.if such negotiation fails, the parties shall submit the dispute to arbitration by the china international economic and trade arbitration commission in accordance with its arbitration rules and the arbitration law of the people’s republic of china.the decision of the arbitration body is final and shall be binding on the parties hereto.
十三、其他
others:
13.1 本合同如有未尽事宜,由甲、乙双方洽谈解决。
if this agreement it unclear with respect to certain matters, the two parties shall discuss to resolve such ambiguities.
13.2 本合同由中、英文写成,两种文本具有同等效力。
this agreement is written both in the chinese and english languages.both versions shall be equally authentic.
13.3 本合同经双方签字后立即生效,未经双方同意,不得任意终止或修改,本合同另有约定除外,本合同一式二份,甲、乙双方各执一份。
this agreement shall become effective upon the signing thereof by the parties hereto an registration with the relevant authorities.save and except as provided in this agreement ,this agreement may not bye terminated or amended without the consent of both parties.there are two(2) originals of this agreement ,one for party a,one for party b.
本合同于__________年 月_____日签订。
this agreement was signed in __________________on ________________
甲方: 乙方:
partya: partyb:
盖章: 盖章:
seal: seal:
地址: 地址:
address: address:
电话: 电话:
telephone number: telephone number:
传真: 传真:
fax number: fax number:
英文合同 篇10
外贸经纪人佣金合同
Commission Agreement of Foreign Trade Agents
甲方:(生产厂家)______________________________
乙方:(中间人)_______________________________
Party A: (manufacturer)______________________________
Party B: (intermediary )_______________________________
根据《中华人民共和国合同法》和有关法律法规的规定,乙方接受甲方的委托,为甲方产品开拓海外市场,双方经协商一致,签订本合同。
According to "People"s Republic of China Contract Law" and the provisions of relevant laws and regulations, Party A hereby appoints Party B to develop overseas market. Both Parties have agreed to sign this agreement.
第一条:委托事项
1. THE ENTRUSTED MATTERS
甲方委托乙方发展海外市场为甲方营销其产品。
Party A hereby appoints Party B to develop overseas market and promote its products.
第二条:委托事项的具体要求
2. OBLIGATION
(1) 甲方应保证所生产产品的合法性及保证产品质量。
Party A shall ensure the legality of the products and ensure product quality.
(2) 甲方与海外客商交易的具体价格、交货方式、支付方式等由甲方与海外客商双方协商约定。
All the trade terms including price, payment term, delivery, etc are negotiated by Party A and customers.
(3)甲方应严格按国家的“FOB、 C&F或 CIF条款”执行与海外客商所签定的合同。
Party A shall be in strict accordance with the " FOB, C & F or CIF terms in the contracts.
(4)乙方承诺每年给甲方介绍______美元的销售额。
Party B promise that the turnover will be more than USD ______ per year through Party B.
(5)乙方应协助甲方回收全额货款及提供最新的市场信息。
Party B should assist Party A to receive the full payment as per the sales contracts.
Party B will provide the market information to Party A.
(6)乙方不能将甲方营业范围内的海外客户关系泄露给第三方,否则甲方会按盗窃公司机密对乙方提起公诉。
Party B should not disclose the customer information to a third party. Otherwise Party A will indict Party B.
第三条:佣金的计算、给付方式、给付时间
3. Rate of commission, payment term
(1) 甲方同意按每笔合同成交总额(扣除税金,运费和货代的费用)的`______支付佣金给乙方。
Party A will agree to pay ______ of the total turnover of each contract - deducting taxes and the freight- to Party B.
(2) 给付方式及时间:
Payment term
在甲方收到合同金额全款后14天内一次性付给乙方。
Party A will pay 100% commission within 14 days upon receiving the full payment from customer.
第四条:违约责任
4. Liability
甲方若不按本合同第三条的(2)执行,逾期一天应支付乙方滞纳金,滞纳金系数为:总佣金的5‰/天。
If Party A does not follow (2) of Section 3, Party A have to pay the overdue fine. The amount is 5 ‰ of the total commission per day.
第五条:协议仲裁
5. AGREEMENT ARBITRATION
双方如果发生纠纷,可凭此合同向甲方所在仲裁机构进行。In the event of dispute, both parties can present to arbitration court from Party A’s place.
第六条:本合同未尽事宜双方协商解决。
6. CHANGES.
Any changes of terms relating to this agreement must be done in a written form, and agreed upon by both parties.
现行协议条款的修改必须经协议双方授权人书面签字方能生效。
第七条:特别约定。
SPECIAL CLAUSE
本合同一式肆份双方各执贰份具有同等法律效用。中英文版本如有冲突,以中文版本为准。 This agreement has been drawn up in four identical copies, of which two copies for each party. The Chinese version of these Terms and Conditions shall prevail wherever there is a discrepancy between the English and Chinese versions. 第八条:履行
IMPLEMENTATION
本合同双方签字盖章即为有效。
Whilst signature on this agreement certifies the intention of both parties to the agreement, the terms of this agreement shall become binding upon both parties only at such time as the following have been complied with, in writing.
第九条:同意签字人AGREEMENT SIGNATORIES
下面签约的各方接受本合同中的所有条款.
In witness thereof, the parties have signed below and by doing so have accepted and approved all covenants, terms and conditions of this agreement.
---------------------------- -----------------------
签名盖章
签订日期
Signing date: 签名盖章