roadbed造句1. State prisoners were brought in to fix the roadbed, and a campaign was launched to acquire locomotives and coaches.
2. How far from the roadbed would we have to go for our topsoil?
3. The earthquake made the roadbed cave in.
4. The steamroller leveled out the gravel roadbed and than the concrete was poured.
5. Using subgrade and roadbed as case, the paper discusses the follow - up value of engineering dossier.
6. The stability of a rock-salt roadbed with two circular cavities is analyzed as a planar strain stress problem with the element-free Galerkin method(EFGM).
7. The steamroller levelled off the gravel roadbed and then the concrete was poured.
8. For the three-dimensional consolidation effect impersonal existence of roadbed and the horizontal thrust from stresses re-distribution of embankment, soil lateral deformation should not be neglected.
9. Railway Roadbed Major Repair Design is an important content of Railway Maintenance Terms.
10. Because of the repeated freeze-thaw cycles, many peculiar roadbed diseases, such as longitudinal cracks, thawing settlement, frost heaving and frost boiling develop in permafrost regions.
11. Roadbed fill a dump truck Rafah operation , bulldozers, share - grader, roller - compacting RCC.
12. The steamroller leveled out the gravel roadbed and then the concrete was poured.
13. He flopped to the sandy roadbed and twisted like an injured snake.
14. Engineering geological conditions are quite good, supporting the roadbed, bridges and culverts and other artificial structures.
15. Put up your hands to build a home of the roadbed.
16. Decreasing the slope gradate and building thermal-insulated beam have no obvious effect on increasing the thermal stability of the roadbed.
17. Conclusion It has favorable effect adopting the grouting technique to deal with longitudinal crack in high-fill roadbed.
18. The present we use finite element method software carries out the analog computation and analysis on montage roadbed settlement, the project design provides direction and the basis to roadbed montage.
19. It is mainly used in road, railway, airport and pier roadbed reinforcement.
20. This project is a comprehensive, systematic project, covering the roadbed, bridges, tunnels and so on.
21. The instrument has higher precision for detecting compacted quality of roadbed.
22. Upon entering the station, the train operator saw a person on the roadbed.
23. The experiment on the correlation between coefficient of foundation and size of loading plate is performed on experimental model of planar load test in lab, which can model field situation of roadbed.
24. In this paper, we combine the specific characteristic of roadbed bearing pressure, and put forward railway line theory and calculate rail counterforce in particular.
25. We use notebook and linear Array CCD to in-phase non-contact measure the vibration of roadbed and rail in the open air.
26. Further more, the road base thickness graphs are provided according to different equivalent axle load action frequency with different roadbed modulus and road surface modulus taken into account.
27. In the end, this conclusion can be used to practice of roadbed engineering of speedway.
28. The article analyses nature of lime, manganese iron, Aeolian soil, cement, and material requirement of roadbed.
29. The control parameters are maximum tensile strain at the bottom of structural layers, vertical compressive strain on the top of roadbed and deflection on the surface of pavement.
30. This paper expounds the geneses and harms of the salty soil, introduces some main methods for the construction of the railway roadbed on salty soil in the emergence project on Xige No.