test run造句1. He's taken the car out on a test run.
2. The generator failed three times during its test run.
3. This short crossing would be a test run.
4. Switch off, disconnect and cover A test run is important.
5. The cameras were in court for a test run, not for broadcasting.
6. A two - week test run has proved successful.
7. The result of the test run satisfied us.
8. ARPG typical game, yes, the test run very smoothly!
9. Iranians start reactor test run.
10. A test run would be useful to the statisticians.
11. After test run, its index meets the design requirements.
12. Shall we begin the test run at once?
13. It is not doubtful that the test run will be successful.
14. The traditional check method is to test run the NC machine tool.
15. We took the new search engine for a test run tonight.
16. The commercial application was successful and the test run showed that the said catalyst activity reached the activity of the oxidation state catalyst RS-1.
17. Software test run through the whole life cycle, but not only perform after coding.
18. The test run result showed that LHA-28 possessed good hydrothermal stability, high bottoms crackability, good coke selectivity and high light oil yield.
19. Therefore, when the mechanical seal leakage test run to exclude inter-shaft seal and cover basically are due to dynamic and static friction ring caused by the destruction.
20. Since test run in 1995 roll - guide in finishing mill has manifestrd short life and seriously influenced the production.
21. The visiting locomotives will progressively arrive during the Steam Festival and after a test run will be used on weekend passenger services.
22. Burfoot took a pair of Puma Concepts for a test run and said he liked them.
23. In accordance with the cause of deactivation of methanation catalyst, a summary of heating up, reduction and test run of J107 catalyst is introduced.
24. So I stopped by the computer store to give it a test run.
25. An unhandled exception on any thread will crash the entire test run, and as mentioned before, integration tests require multi-threading.
26. Most legacy systems are not modularized into identifiable, distinct components that you can test run independently of others.
27. In addition to rerunning the test, you also might want to save a test run to refer to the inputs and outputs at a later time.
28. The custom code in SAMPLE_VAR2 will sequentially go through the defined array during the test run, restarting when at the end of the values.
29. One of the key components failed to initialize during the test run.
30. Some experiences of the mill retrofit including equipment import, non standard sets complement and commissioning test run in Guangzhou Paper Mill recent years are summarized in this paper.