快好知 kuaihz


test run造句
31. Japan's space ambitions have had a set-back after the failure of an engine in a test run. 32. We must take the plant through the test run and finally into commercial operation. 33. The present paper briefly described the construction of the project, commissioning test run of the new facility and the initial results of the project. 34. The problems existed in imported equipment and domestic auxiliary equipment during test run, and correspond. 35. With the buffer pool size of 250 pages, the application test run experienced very poor buffer pool hit ratio of 48.69%. 36. A pseudo-random number between 1 and zero will be provided on each test run. 37. After the molds are cured I'll run some tool stone plugs and do a test run. 37. Wish you can benefit fromand make progress everyday! 38. The inclination and toe-in can be checked by test run. 39. Then, in subsequent test runs, a human tester will not need to look at the text equivalent again unless the image or the text has changed since the last test run. 40. After a debugging and commissioning test run, the result shows that the system structure is simple, handy, reliable and antijamming. It can be spread to any other similar application environment. 41. The vote was seen as a test run for elections to come. 42. The systematic hydrostatic test run, hot test, dynamic test, actual start - up is scheduled for next Monday. 43. We shall soon put the chemical installation into commissioning test run(performance test). 44. The settler of crude oil heater usesinternationally advanced crude oil heating-settling separation technology, which has a high degree of automatization and is difficult in test run. 45. Use of bottom bearing changed the critical rotation rate, and the vibration occurred in the test run of dimethoate reactor was solved. The requirement of production was, then, reached. 46. After being built, populated, and tuned, the database was backed up so that the testing environment could be returned to the same "baseline" state prior to each test run. 47. The system has been put into test run, and obtains the primary recognition of the users. 48. But often, the result is a do-nothing benchmark, which the compiler can optimize away partially or completely without you realizing it, making the test run faster than expected. 49. Once again, you need to calculate a scaling factor for each test run. 50. After the overall test and confirming to meet the demands, the clients test run, the steps are as follows. 51. The work of the paper is composed of the systematic design, mounting, adjustment, service manual, test run, actual test, error analysis, etc of the test apparatus.