快好知 kuaihz


leak造句
241. Engineers plan to shoot heavy mud into the crippled blowout preventer on top of the well, then permanently entomb the leak in concrete. 242. Finally, use this method try to simulate Labyrinth Seal Models, obtain flow field characteristics and leak rate in different gap width and cavum depth. 243. The shingles must be fixed; otherwise the roof will leak.