culvert造句(31) These culvert pipes will run out after half of the project is completed.
(32) And be widely used for the anchor spray supporting construction in tunnel, culvert and underground projects.
(33) The surface subsidence analysis content includes two-dimensional finite element analysis. for the surface subsidence, which is caused by pipe roof, small pilot holes and jacking box culvert.
(34) He slipped end - over - end, across the culvert outlet and landed on the left side of it.
(35) The statistics show , the total length of construct things , such as bridge, culvert overpass etc.
(36) According to reports, the body was in the culvert was found after treatment with nameless corpses.
(37) The fill back of the bridge and culvert, because of its especial position, has compressed not very close-grained sometimes. The sinking is a familiar disease.
(38) For direct - burial long haul line . Bridge and culvert , Duct, Bullet - proof aerial deployment and LANs.
(39) And the design approach of widening bridge and culvert is studied and summarized.
(40) In body odour poem, what be culvert life philosophic theory and author thought comes to realize.
(41) Natural frequency of culvert tail rotor of some kind of helicopter with uncertain composites was studied.
(42) Standard Practice for Least Cost (Life Cycle) Analysis of Concrete Culvert, Storm Sewer, and Sanitary Sewer Systems.
(43) After days of hard work , the culvert was at last completed.
(44) Combined with practical reformation project the application of jacked culvert technology is introduced for the cable tunnel passing through the foundation of existed buildings.
(45) In the course of filling of Mashi Lock, a lot of air from the valve well comes into the culvert so as to produce many big air bubbles in the chamber, which is dangerous to the passing ships.
(46) Besides, the current bridge and culvert design criterion takes some basic postulation during the calculation of the bridge's member in bending, which results in over-conservative numeric value.
(47) They sought shelter first in a lean-to they made of branches, then in the culvert under a road.
(48) Pine wood piles strengthening slush soft soil subbase is introduced on the basis of a major blow-off box culvert project.
(49) A difficult problem in sewer main construction, the joint of sewer main pipe to underground double-deck culvert has been solved by a new method: blast operation.
(50) The results show that edge-shape of lock chamber ports, culvert length and head loss in culvert will all affect the distribution of port discharge.
(51) The bifurcated pipe of the TGP lock emptying culvert is a reinforced concrete framed structure.